Calibration of feed dose on a boiler equipped with a suction unit:

When the on board pellets storage has been filled it is time to calibrate the feed rate.

Remove the front casing of the fuel store. The internal fuel store and burner unit will be visual. 

Remove the fall shaft connection by removing the elbow coming out from the storage. For refe-

rence see illustration on page 15.

Place a container underneath the hole to the feeding opening where the elbow used to connect 

to the storage to collect the pellets that will be fed during a auger filling procedure. 

The hole down the fall shaft to the burner (where the black plastic hose where connected origi-

nally) needs to plugged temporarily in order to be able to build under pressure in the fire box and 

allow the auger to feed in test mode.

Enter the OPERATION menu and then INSTALLATION menu. Activate the FILL FEEDER function 

which will force feed pellets for 15 minutes. Meanwhile the auger is filling up tap the auger repea-

tedly to ensure that it is packed with fuel. When pellets comes out at the end of the auger the fill 

feeder should be set back to NO and then directly back to ON to have a full 15 minutes feed of 

pellets to make sure enough pellets is in the auger. Collect the pellets in a bag or container during 

this 15 minute feed. Do not stop the feeding process, it is critical to have a properly packed and 

filled auger in order to calibrate the feed rate in the next step.

▀  

Calibration of feed dose - Suction version

A correctly adjusted start dose is one of the most critical and important steps of a 

comissioning process. If the start dose is incorrect it will give the wrong output on the 

boiler which might create operational issues, excessive wear on parts and even be 

dangerous in extreme situations. 

Содержание Komplett III 20kW

Страница 1: ...Rev HA 015 02 18 COMISSIONING GUIDE QUICK START GUIDE EFFECTA KOMPLETT III 20 25 35 kW...

Страница 2: ...d in depth in the product manual Introdction Symbols in the document Note The icon is shown when a important notice of the products needs to be understood High voltage When the icon is shown extra cau...

Страница 3: ...P 10 Calibration of feed rate Integrated fuel store model P 11 Calibration of feed rate Integrated fuel store model P 12 Calibration of feed rate Vacuum fed model P 13 Calibration of feed rate Vacuum...

Страница 4: ...om circulation Doors All doors and cleaning accesses needs to be closed and sealed before powering up Flue chimney The boiler must be connected to a approved flue system to evacuate smoke gasses befor...

Страница 5: ...nd boiler temperature A CO2 vaule is displayed only in operation phase if the a lambda probe is used A flame icon indicates the flame value visual inside the boiler in percent If the electrical heater...

Страница 6: ...recommend the following values to get the boiler operating enough to be able to measure with a flue analyzer The Fan burner low parameter is set to ON if you which to have the low power output mode ac...

Страница 7: ...that it is done precisely and according to this manual If the feed doses isn t setup according to our recommendations the boiler will deliver a faulty output which can damage the system and it will mo...

Страница 8: ...er is attached to a external feeding auger the start dose value needs to be veriefied ac cording to the below information Remove the black plastic hose which connects the feeding auger with the burner...

Страница 9: ...e and then run the test start dose again Keep testing until the start dose being fed is exactly 40cl When this step has been processed the boiler is to be reassembled again by putting the fall shaft h...

Страница 10: ...dose value needs to be veriefied according to the below information Remove the front and or side casing of the fuel store The internal fuel store and burner unit will be visual Remove the black plast...

Страница 11: ...d is exactly 40cl When this step has been processed the boiler is to be reassembled again by putting the fall shaft hose back in to the burner Burner Fan Feeder settings Temperature set Information Se...

Страница 12: ...o 48s which will get you reasonably close to the correct start dose value Calibration of feed dose Suction version Burner Fan Feeder settings Temperature set Information Service Installation Off VER 3...

Страница 13: ...will take 2 3 minutes until the turbine comes on and with a empty storage it can take up to 15 minutes until it is fully filled Burner Fan Feeder settings Temperature set Information Service Installa...

Страница 14: ...ire box and allow the auger to feed in test mode Enter the OPERATION menu and then INSTALLATION menu Activate the FILL FEEDER function which will force feed pellets for 15 minutes Meanwhile the auger...

Страница 15: ...s step has been processed the boiler is to be reassembled again by putting the fall shaft hose back in to the burner NOTE A good value to begin with is 48s for the start dose It will take the initial...

Страница 16: ...stallation Off Operation settings Boiler temp G1 Stop temp Start temp Temperature set 50 C 80 C 70 C Effect output Press OPERATION and then open the INSTALLATION menu Scroll down to Effect high speed...

Страница 17: ...0 Off Off 100 Off Off Off Off Off Off Off Off Function test of shunt motors Press OTHER and then open the FUNCTION TEST menu Depending on what functions the boiler have been deli vered with a differe...

Страница 18: ...PROT and press OK In the BACKEND PROT menu make sure that the function is set to YES Recommended settings Temp G1 min 60 C Max flow temp 20 C Description of function The first parameter Temp G1 min is...

Страница 19: ...the main board in order to activate heating circuit one The second and third heating circuit is controlled from the expansion board and are at port G9 and G10 NOTE If the flow sensor for the desired h...

Страница 20: ...ing on the same program option The difference between to the program BOTH and the program OUTDOOR is that the room sensor will correct the temperature to the flow with 5 C for every C the room tempera...

Страница 21: ...wo different times each individual weekday Recommended to use when The cylinder is very remote without possibility to connect a sensor Cylinder 2 If the program CYLINDER 2 is choosen the shunt motor w...

Страница 22: ...temp G6 only when G5 G6 is active C Boiler stop temp G5 only when G5 G6 is active C Max G6 only when G5 G6 is active C Max G1 only when G5 G6 is active C Start dose value S Start dose measured value...

Отзывы: