Section
II:
Installation
2.0.INS.SL-518
4.
Install the hydraulic adapters and hoses from the three-section hydraulic control
5.
valve to the hydraulic cylinder (
Pt. No. 21P84
) shown on drawings
Pgs. 6-12 & 6-13
of the manual. Tie up all loose hoses as required. Be sure the hoses are routed to
avoid exhaust components and all moving components of the rear axles.
6.
After the start procedure has been completed on the hoist, verify that the movement
of each control lever corresponds to the movement of the cylinders per the figure
below. Operate the stabilizer through 5 to 8 cycles to remove the air from the
hydraulic cylinders and lines.
2-16
Содержание SWAPLOADER SL-518
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 518 ...
Страница 2: ......
Страница 16: ...Section II Installation 2 0 INS SL 518 Figure D Figure E 2 4 ...
Страница 41: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 29 ...
Страница 42: ...This Page Intentionally Left Blank ...
Страница 46: ...This Page Intentionally Left Blank ...
Страница 54: ...This Page Intentionally Left Blank ...
Страница 58: ...Section IV Maintenance 4 0 MAI SL 518 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 66: ...This Page Intentionally Left Blank ...
Страница 92: ...This Page Intentionally Left Blank ...
Страница 93: ......
Страница 94: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 Rev 07 29 2022 ...