ENVIRONMENTAL REQUIREMENTS
EFAPOWER EV-PC Station reliability is dependent upon compliance of environmental specifications. The design
of the environmental control system for your EFAPOWER EV-PC Station, in case of extreme environmental
conditions, must ensure that the Unit can operate reliably while remaining within the range of its operating
specifications.
The enclosure should be inspected during maintenance for evidence of damage or deterioration. A soft cloth
moistened with water must be used to remove accumulated dust and dirt on the outside of the unit to preserve
the integrity of the structure and avoid displacing dust or dirt into any delicate components of the equipment.
Seals and gaskets should be examined and repaired or replaced if required and fasteners tighten should be
verified. The frequency of maintenance of the enclosure should be increased with extreme weather conditions.
5.1.1
LOCAL CONDITIONS
EFAPOWER EV-PC Station is an
IP54 (NEMA 3R) enclosure. This Unit is intended to work below 50ᵒC
(122°F)
ambient temperature.
Clearance around the cabinet
We advise to have at least 0,5 m
(20”)
in the front and both sides, or according to local codes
Input Power Cables
AC input cables must be copper with appropriate power rating.
Distance between Units
Whenever it
’
s required the
installation of Central and Satellite Units
, the
Ethernet
cable connecting the units
shall not be longer than 100 meters
.
EFAPOWER EV-PC Station can be placed as showed in Figure 5.
Figure 5 - EFAPOWER EV-PC Station - placing