Parts List
A
Rubber Mallet
Gloves
Preparation
E2
PARTS LIST
Description
Qty
Part#
A. Post
8
URHP36-SV
B. Brace
10
ZRBM24-SV
C. Beam
10
ZRBM48-SV
D. Laminate Deck
5
RPB2448B9MM
E. Inside Post Connector
4
CPHP-SV
F. Post Cap
8
RL-PC-B1
ALTERNATE ASSEMBLY
This unit can also be assembled as two separate 36 in. high units (see FIG. 4). One unit
will have three shelves and the other will have two shelves. If choosing this option, follow
assembly steps 2, 3, 4, and 9 until all shelf levels are completed for both units. Note: Use
all 8 of Post Caps (F) in final step 9. Post Connectors (E) are not used for this setup.
Alternate Assembly:
Two 36 in. high units.
D
E
F
Assembly of this unit is done by fitting the two rivets of the braces (B) and beams (C) into the keyhole slots of the post (A). The narrow end
of the keyhole slots from the post must face down (see FIG.1). Braces and beams must be installed with the ledge facing up on the inside.
Assemble the unit from bottom to top. It is recommended that the bottom shelf assembly be installed into the second keyhole slots at the
bottom of the posts. The middle shelves should be evenly spaced. A rubber mallet should be used to tap down on the top of the braces and
beams to properly seat the rivets down into the narrow end of the keyhole slots (see FIG. 2 and FIG. 3).
B
C
FIG. 4
✓
FIG. 3
Rivets properly
seated into the
narrow end of
post slots.
HELPFUL TOOLS/ITEMS FOR ASSEMBLY (NOT INCLUDED):
Narrow end
of slots face
down
FIG. 1
A
B & C
Rivets
→
→
Use a rubber mallet
to lightly tap down
on Brace / Beam to
seat the rivets down
into the narrow end
of the post slots.
FIG. 2
→
→
→
→
Inside view
Inside view
Inside view