background image

Installing the SwitchAir

1. 

Mount the adjustable rails using customer 

provided cage nuts and screws. The new build 

rails will be used to support the network switch, 

SwitchAir chassis and insert. Attach the new 

rails using only the top front screw holes on 

both rack front rails. The rail extension tab 

attaches to the rack rear using a single cage nut 

and screw. Use the centre hold of the 1U space 

for this attachment.

2. 

Slide the network switch into the rails and 

mount to the rack using customer provided 

cage nuts and screws.

3. 

SwitchAir is not in the fully extended position 

when shipped from the factory. Pull evenly 

on the chassis mounting tabs for the desired 

depth.

4. 

Insert SA1 into the rails and push unit until the 

insert comes into contact with the network 

switch and the chassis tabs are in contact with 

the rack. During this process route the cables 

through the brush openings. Install the bottom 

SA1 chassis screws on both sides.

5. 

Install is complete.

Install Adjustable Rails 

For SA1

Install Top Cage Nuts 

& Screws to Both 

Sides of Rack

Mount to Centre Hole 

of 1U Space

Pull Evenly on Tabs to 

extend

Route Cables

Attach to Rails

Slide SA1 into Chassis

Network Switch

Insert

Ver: EDPSA1002XLNBIG1118.1

ü

 www.edpeurope.com 

š

 [email protected]

Å

 +44 (0)1376 510337

Отзывы: