background image

2.0   Transportation Instructions

 

 

 

Safe transportation of the devices is only ensured if original packaging is used. If they 

are bumped hard or put down roughly, damages can occur. 

 

 

ATTENTION:

 Do not lift the devices at the shaking plate (tray)! 

 

 

 

Transport the devices by holding them at the housing    

 

 

 

only ! 

 

 

 

3.0   Installation and Connection 

 

 

 

Place the shaker on a level, smooth and firm surface so that it stands firmly also at high 

shaking frequencies. The shaker models VKS 75 are designed for operation at the 

ground. 

 

Compare operating voltage on the rating plate at the back of the device with your supply 

voltage. If they match, connect the device.  

 

 

 

ATTENTION

:

 The system may only be connected to a mains with  

 

  protection 

earth! 

 

 
 

 

 

When installing the devices make sure that they are 

 

 

 

protected again splash water.  

 
 

 

 

The safety distance between the device and other  

 

 

 

instruments or a wall must be chosen in such a way 

   that 

the 

shaking 

plate 

is freely movable and that the 

   operating 

personnel 

cannot 

be injured when the shaker 

 

 

 

is switched on or during operation. 

Edmund Bühler GmbH   ALLGEM\BED.SMG/BEDSME/TXTE.DOC – 01/08 

5

Содержание KS 15 control

Страница 1: ...Operating Instructions B hler Shakers Edmund B hler GmbH ALLGEM BED SMG BEDSME TXTE DOC 01 08 1...

Страница 2: ...2 SM 30 C and TL 10 16 4 3 1Change of the Angle of Inclination Orbital Shaker TL 10 17 4 4 Adjustment of the Counterweight TiMix 5 TiMix 5 control 17 4 5 Exchange of the Rack Systems of KS 15 TiMix 2...

Страница 3: ...all claims under warranty end immediately in case of damages which result from misuse and or abuse 4 The devices were carefully checked for perfect functioning and condition before delivery 5 Necessar...

Страница 4: ...hes Coloring and decoloring of gels Thanks to their different motions and high loading capacities and especially their variable Combifix rack systems the B hler shakers of the Edmund B hler GmbH offer...

Страница 5: ...r models VKS 75 are designed for operation at the ground Compare operating voltage on the rating plate at the back of the device with your supply voltage If they match connect the device ATTENTION The...

Страница 6: ...200 250 300 350 400 420 The Operation Panel has two control knobs With the left one the required speed can be adjusted speed range see Technical Data The right control knob is for the timer function...

Страница 7: ...the function forward direction 6 Mode key for choosing the function backward direction 7 Display Actual speed running time large display 8 Display Set speed running time small display at the upper rig...

Страница 8: ...symbol is blinking Operating Mode A When the device is switched on the speed is 0 both set value and actual value The timer function is not active If a time was programmed the speed is 0 when the tim...

Страница 9: ...ol knob to the right the display shows SV Set Value When turning the control knob slowly the value can be changed by seconds when turning it fast in minute steps When values above 60 minutes are enter...

Страница 10: ...turning the control knob to the right If the value for the time is 0 the device starts Press keys or for entering the running time Adjust the required time with the control knob the display shows SV...

Страница 11: ...e Mode keys With the Mode keys you can change between the functions Add Del or Rem Run Stop Prog and Rpt The meaning of these functions is described below 248 3 P4 Add 248 3 Rem 248 3 RUN 120 P0 STOP...

Страница 12: ...d In segments 7 and 8 the next program to be integrated in the program flow is displayed The pogram can be selected with the control knob and integrated in the program flow by pressing the OK key Maxi...

Страница 13: ...switched on if Rpt yes You can choose between yes and no with the control knob 4 How to edit programs Within each program you can program one speed and one running time During programming the number o...

Страница 14: ...amp can be defined Press key or until PROG appears on the display The number of the program is shown at the upper right side PO Confirm program No P0 with the OK key The speed appears on the display E...

Страница 15: ...program which shall run first e g P5 Confirm with OK then select the next program and confirm again with OK In this way max 5 programs can be lined up 532 Now you can choose whether this program flow...

Страница 16: ...motion can be changed by means of the coupling lever at the right side The coupling lever must audibly snap into its final position Pull out coupling lever orbital motion Push in coupling lever to and...

Страница 17: ...actly in the direction of the finder sleeve 2 see fig 1 Switch the shaker off turn the shaking plate 9 by hand into the furthest position at the right then the adjustment spindle 3 and the counterweig...

Страница 18: ...Edmund B hler GmbH ALLGEM BED SMG BEDSME TXTE DOC 01 08 18...

Страница 19: ...and remove the rack system Fasten the shaking plate to the respective drillings with the same screws and put the rubber mat on the shaking plate Microplate Shaker TiMix 5 The TiMix 5 shakers can be c...

Страница 20: ...ite plastic part POM At the bottom side of the 2 storey top frame there are metal rails On these rails there are outer drillings for fastening the frame and in the middle two drillings close to each o...

Страница 21: ...d after removal of the fuse insert ATTENTION Before removal of the fuse insert disconnect the mains plug 5 2 Motor Protection The capacitor drive is equipped with a thermal overload protection In case...

Страница 22: ...apply for all shakers type SM 30 EN 61 326 1 2006 05 EN 61 000 3 2 2006 04 EN 61 000 3 3 1995 01 A1 2001 06 A2 2005 11 EN 61 326 1 2006 05 Hechingen January 2008 EDMUND B HLER GMBH 7 0 Warranty The E...

Отзывы: