
- 43
-
ENGLISH
f
d
c
b
a
e
g
h
h
i
l
c
g
g
d
f
e
Ŏ
g. c
i
b
c
h
h
d
i
g
b
l
l
e
NOTE:
USE THE DUCTING CONNECTION POINT FITTING
KIT (PROVIDED) TO BE PLACED ON THE BACK OF
THE STOVE FOR FASTENING THE DUCTING PIPE,
CONTACT AUTHORIZED TECHNICAL SERVICE CEN-
TRE TO ROTATE THE FAN TO THE REAR POSITION.
THE FIRST PART OF THE FLEXIBLE PIPE MUST BE
COMPLETELY “RELAXED” IN SUCH AWAY TO ELI-
MINATE CORRUGATION. IN THIS WAY, THE INTER-
NAL DIAMETER WILL BE SLIGHTLY ENLARGED TO
FAVOUR ENTRANCE.
Procedure:
- De
Ŏ
ne the position of the stove with respect to the walling
(
Ŏ
g. a).
- Place the stove in its de
Ŏ
nite position.
- Extend the aluminium pipe (b) for hot air channelling, wi-
thout connecting the stove outlet.
- Fit the alluminium pipe to the hot air oulet on the back of the
stove (
Ŏ
g.C) and fasten it by its blocking clamp (g)
- Install the hot air outlet(c) into the room to heat and the allu-
minium pipe (b)
Ŏ
xing it by the wall collar (h) and nogs with
screws (i-l)
b
d
e
Ŏ
g. a
Ŏ
g. b
g
a
Box
n°
1
b
Ø 8 pipe
n°
1
c
Smoke outlet end-piece
n°
1
g
Pipe blocking clamp
n°
2
h
Wall collar
n°
2
i
Screws
n°
4
l
Dowels
n°
4
KIT 12 BIS (code 778160)
(optional)
TO CHANNEL HOT AIR INTO A REMOTE ROOM
IN ADDITION TO THAT OF INSTALLATION
Includes:
HOT-AIR DUCTWORK