ENGLISH
ENGLISH
ENGLISH
ENGLISH
1
2
4
3
21
When opening the packaging, verify that all components are present.For any anomaly, refer to the retailer from whom you
purchased.
INITIAL OPERATIONS
CRISTAL is delivered:
in one item (A) on bench, for the N version
item A
item A
in two items (A and B) on bench, for the V-EWS version
Item B contains the following components:
- fan box
- ø 14 cm pipe fittings/bands
- fitting with ø 20 cm gate
- fitting with ø 12.5 cm gate
- actuator for fuel air gate
- electronic board
- controls panel
- plastic support for actuator
Apply the plastic support (1), using the supplied self-threading screw, to the gate
fitting.
Apply the actuator (2) fitting it on the gate peg through the appropriate slot (3).
Verify that once the actuator has been applied, the gate remains slightly open (4)
and that when rotating, it opens until the horizontal position is reached.
The gate fitting with actuator is to be assembled to the chimney by replacing it to
the fitting with manual gate (fig. 6 at page 24) of the N version.
NB: the fitting with manual gate for the N version pre-assembled in item A is not
to be used for the V-EWS version.
To carry out the operations, refer to the following pages.
Gate fitting with plastic
support (1)
Gate fitting with actuator (2)
Assembled gate fitting
item B
Содержание CRISTAL 45 N
Страница 110: ...CRISTAL 45 110 ...
Страница 112: ...CRISTAL 76 112 ...
Страница 114: ...CRISTAL 90 114 ...
Страница 117: ...117 ...