- 31
-
ENGLISH
INSTALLATION
NOTES ON FITTING THE COVERING
• If using a prefabricated Edilkamin covering, In order to de
Ŏ
ne
the exact position of the IDROPELLBOX, it is important
to check which covering will be used to complete it.
Positioning differs according to the model chosen (see assem-
bly instructions given in the packaging of each covering).
Always check that installation is perfectly vertical and horizon-
tal.
• Before installing the covering, check that all connections,
commands and moving parts are perfectly functional.
• Check this with the boiler-
Ŏ
replace on and working for a few
hours. Do so prior to
Ŏ
tting the covering in order to intervene
as necessary.
Finishing works, such as construction of the counter-hood,
covering assembly, pilaster preparation, painting, etc.,
should be carried out once the
Ŏ
nal test has been passed.
• Edilkamin will therefore not be held liable for any charges
deriving from both demolition and reconstruction works,
even where consequent to replacement of any faulty boiler-
Ŏ
replace parts.
• Rather, at least 1 cm. (approx.) space must be left to allow
air to
ŏ
ow, thereby preventing heat from accumulating. The
counter-hood can be created from
Ŏ
reproof plasterboard panels
or plaster sheets. When creating this, the air circulation grill
must be included, as previously speci
Ŏ
ed.
•
During the construction phase of the covering it is funda-
mental to ensure that the combustion air is restored
to prevent pressure phenomena in the room where the
boiler-
Ŏ
replace is installed (refer to the Chapter regarding
the external air inlet on page 30)
•
In addition to the above, always consider the indications
given by paragraphs 4.4 and 4.7 of standard UNI 10683
“insulation,
Ŏ
nishes, coverings and safety recommenda-
tions”.
CREATING THE MANTEL
•
the mantel can be constructed with
Ŏ
re resistant panels in
plasterboard or gypsum board.
•
aeration grilles for preventing any excess temperature
inside must be provided for during construction.
N.B.: IMPORTANT FOR INSTALLATION CONDITIONS
There must be two ventilation grilles (surfaces greater than
300cm²); the
Ŏ
rst must be at a height which is lower than the
hearth, while the second must at a height greater than 30 cm
with respect to the upper pro
Ŏ
le of the outlet.
These grilles prevent the accumulation of heat inside, which is
then used to help heat the room of installation.
Warm air outlet
at the front
*
Internal mantel
ventilation grilled
*
Recycled air intake
External
intake
30 cm