
54
&
Connecting to the Management Port
Connecting to the Ethernet port
&
SFP transceiver installation
Install the SFP transceiver in the SFP slot
&
XENPAK
transceiver
installation
Install the XENPAK transceiver in the XENPAK slot
Copper Cable/Fiber cable connection
Ethernet cable connection
Fiber cable connection
&
Power supply connection
2.3.1 Switch Installation
2.3.1.1 Desktop installation
z
Note:
●
Choose a smooth level workbench
●
Verify that the workbench is strong enough to support the ES4704BD’s fully
configured weight
●
Plan a good position for your ES4704BD that is easy to operate and has an
appropriate power source and grounding point.
●
Place the ES4704BD safely on the workbench, avoid obstructions on any side
of the switch.
To avoid damage, do not place any weight on the switch.
2.3.1.2 Rack-mounting ES4700BD
z
Note:
Before mounting the ES4700BD into the rack, verify that the mounting positions
of the rack are correct. Preposition of the mounting points may result in inadequate
spacing between the switch front panel and the rack front door, and the rack front
door may be unable to be closed with cables and fiber cables connected. Please
keep a 10 mm spacing between the switch front panel and the rack front door.
Verify the following before installation: the rack is stably positioned; all modules
inside the chassis are fully installed; no obstructions are present inside or around the
rack; the switch is situated near the rack for ease of installation.
Notice
Содержание ES4704BD
Страница 1: ...i www edge core com ES4700 series Chassis Core Routing Switch...
Страница 8: ...viii...
Страница 52: ...42 FIG 1 31 ES4710BD Rear Panel View 1 4 9 Side Panels...