
C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 35 –
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
ACKAGE
C
ONTENTS
◆
Fast Ethernet Fiber Access Switch (ECS3510-28F)
◆
Power Cord—either US, Continental Europe or UK
◆
Four adhesive foot pads
◆
Rack-mounting kit (two brackets and eight M4 screws, plus four 12-24 rack
screws with cage nuts)
◆
RJ-45 to DB-9 serial converter (for console connection)
◆
This Installation Guide
◆
Management Guide CD
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have a screwdriver (Phillips or
flathead, depending on the type of screws used.
Содержание ECS3510-28F
Страница 1: ...Installation Guide www edge core com ECS3510 28F 28 Port Fast Ethernet Fiber Access Switch...
Страница 2: ......
Страница 4: ......
Страница 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Страница 20: ...TABLES 20...
Страница 22: ...FIGURES 22...
Страница 68: ...GLOSSARY 68...
Страница 71: ......
Страница 72: ...ECS3510 28F E062010 CS R01 150200000112A...