background image

–  

1

  –

Quick Start Guide

1.

PSU LED: 

Green (OK), Amber (fault)

2.

QSFP-DD Port LEDs: 

Blue (400G), Cyan (200G), Green (100G), 

Yellow (50G)

3.

QSFP28 Port LEDs: 

Green (100G), Cyan (50G), Magenta (40G), 

Blue (25G), Yellow (10G)

4.

SFP28 Port LEDs: 

Blue (25G), Green (10G), Cyan (1G)

5.

System LEDs:

 

PSU1/2 — Green (OK), Amber (fault)
DIAG — Green (OK), Orange (fault detected)
FAN — Green (OK), Orange (fault)
LOC — Blinking Blue (OK)
ALARM — Green (OK), Red (alarm)

6.

RJ-45 Management Port LEDs: 

Left (link), Right (activity)

7.

BITS/ToD LEDs: 

Green (valid BITS), Blinking Green (1PPS ToD)

1

6

4

7

2

5

3

E052022-CS-R01

150200002489A

Ethernet Switch

AS7535-28XB

1.

AS7535-28XB (includes 2 PSUs and 6 fan trays)

2.

Rack Mounting Kit—2 brackets and 8 screws

3.

Grounding kit—grounding lug, 2 screws, and 2 washers

4.

(Optional) AC power cord

5.

Documentation—

Quick Start Guide

 (this document) and 

Safety 

and Regulatory Information

Package Contents

Overview

FRU Replacement

1

Status LEDs

1.

2 x DC or AC PSUs 

2.

2 x 100G QSFP28 ports

3.

2 x 400G QSFP-DD ports

4.

24 x 25G SFP28 ports

5.

Product tag

6.

Management I/O: 1000BASE-T RJ-45, RJ-45 console, 
Micro-USB console, reset button

7.

BITS/ToD RJ-45 timing ports

8.

10MHz/1PPS I/O

9.

GNSS antenna

10.

USB Type C storage port

11.

RJ-45 alarm port

12.

6 x fan trays

13.

Grounding screw

1

12

4

7

11

6

13

5

9

10

8

2

3

www.edge-core.com



2

3

4

5

Fan Tray Replacement

1.

Loosen the fan tray screw.

2.

Pull out and remove the fan 
tray.

3.

Install replacement fan tray.

PSU Replacement

1.

Remove the power cord.

2.

Press the release latch and 
remove the PSU. 

3.

Install replacement PSU.

Отзывы: