![eDecks Queen Anne Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/edecks/queen-anne/queen-anne_fitting-instructions-manual_2357557002.webp)
Step 2
Don’t forget to check your work with a level as you go!
Page 2 of 13
RAISING THE FRAME
Lifting the frame into position
will require at least
2 - 3 peaople
Concrete can be bought
from us too!
A.
Arrange the 600mm deck raisers in position
as shown in diagram A
B.
Each strutt will need to be set 200mm down into a concrete base
leaving 400mm of each strutt exposed
C.
Once raising strutts are securely set in concrete base lift the
assembled joist frame to be level with the strutts (400mm).
Using the screws provided fix the frame to the strutts.
www.eDecks.co.uk
All images are for illustration only, Please see individual item listings for actual item specifications
Queen Anne Fitting Instructions
FRONT
FRONT
FRONT
A.
B.
C.
400mm
200mm
200mm
400mm