![eDecks Queen Anne Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/edecks/queen-anne/queen-anne_fitting-instructions-manual_2357557011.webp)
Step 11
Don’t forget to check your work with a level as you go!
Page 11 of 13
INSTALL THE HANDRAILS
Pre-Building the spindles and handrails is the next step.
Accurately measure between pergola posts and cut the hand and base rails accordingly,
there should be a 125mm gap between each spindle
www.eDecks.co.uk
All images are for illustration only, Please see individual item listings for actual item specifications
Queen Anne Fitting Instructions
Then complete the handrail section
by fixing the upper part of the handrail
to the lower part of the handrail
Do this by screwing up through the
underside of the lower handrail into
the top part of the handrail
Screw into each spindle
from under the baserail
Screw through the lower
handrail into each spindle
Upper Handrail
Lower Handrail
Approx
125mm Gap