IT IS CRITICAL THAT YOUR POSTS ARE AT EXACTLY
THE SAME HEIGHT AND COMPLETELY STRAIGHT!
INSTALLING THE PERGOLA POSTS
Depending on your kit & post option you
will need to follow one of the following
options for each of the posts in your kit.
OPTION 1
Excavate holes for the pergola posts.
These need to be to a depth of
300mm (Kit option with 2.1M posts) or
600mm (Kit option with 2.7M Posts)
then fill with concrete we recommend
MetCrete to set quickly
Option 2
Bolt Down Anchors - Attach the Bolt Down
Anchor to your concrete area, drill an
8mm hole using an SDS drill bit,
ensuring the hole depth is 10mm longer
than the bolt length to allow for dust.
Remove any loose dust and fix the bolt
into place through the holes provided in
the anchor. Slot your pergola post into
the boltdown and tighten the 2 bolts at
the side of the anchor to secure. Making
sure its straight.
Option 3
Steel Spikes - Using the Mett Driving tool
and a sledge hammer or something
equivalent drive the steel spike into the
ground. Once post is in position tighten
the 2 bolts on the side of the spike to
secure post in place.
1
2
3
STEP
2
Cont’d
DON’T FORGET TO CHECK YOUR WORK WITH A LEVEL AS YOU GO!
All images are for illustration only, Please see individual item listings for actual item specifications
Page 4 of 11
www.eDecks.co.uk
Parliament Pergola Fitting Instructions