If your kit option has handrails please assemble these prior to attaching to your newel posts (next step)
To fix the spindles you should screw into each spindle from under the baserail and through the top of the lower
handrail, space the spindles so they are evenly spaced with approx 125mm gap between each.
Screw into each spindle
from under the baserail
Do this by screwing up through the
underside of the lower handrail into
the top part of the handrail
Screw through the lower
handrail into each spindle
Upper Handrail
Lower Handrail
Approx
125mm Gap
Step 6
INSTALL HANDRAILS
Then complete the handrail section
by fixing the upper part of the handrail
to the lower part of the handrail.
Don’t forget to check your work with a level as you go!
Page 7 of 11
www.eDecks.co.uk
All images are for illustration only, Please see individual item listings for actual item specifications
Hot Tub Decking Kit with Roof