TL-9-I-0715
8
301-638-3326 • edcoinc.com • [email protected]
EQUIPMENT DEVELOPMENT COMPANY
GETTING STARTED WITH YOUR NEW GRINDER
LOADING TOOLS:
Return level lock to the operator position.
LOADING TOOLS:
Lean back slightly on the handle to get the
tools off the surface and start the machine.
Lower the machine to the surface and do a
short touch pass on the concrete.
SWING AXLE:
Loosen nut at rear wheel and raise or lower
until a complete circle is achieved in a test
area on the floor.
Also machine should move freely across the
floor and not pull left or right.
DUST CONTAINMENT RING:
The Dust Containment Ring floats along with
the grinder during normal use. Only remove
this ring to grind next to walls.