Edco TG-10 Скачать руководство пользователя страница 20

800-638-3326 • edcoinc.com • [email protected]

EQUIPMENT DEVELOPMENT CO., INC.

Scan This QRC or Visit  

www.edcoinc.com/customer-support

READ

 

EDCO Owner’s Manuals and Parts Listings share basic information 

and parts of each product.  Download and print them whenever needed.

WATCH:

 

 

EDCO Product Training Videos show how to use products, install 

tooling, and perform basic maintenance.

FIND:

 

Somewhere on this product is an 

EDCO QRC Training Decal.  Scanning 

this code provides owner’s information, videos, and other training content 

anywhere/anytime on your mobile device.

JOIN:

  

EDCOed.com is a free, 24-hour training space.  Each certification track 

focuses on a specific EDCO product group.  The information in these tracks help 

businesses be successful with those products.

 

Example Only

EDCO is always updating online training / information so you always have the most recent content.

Also see Operator’s Safety & Limited Warranty Manual

Equipment Development Co., Inc.  •   800.638.3326   •    [email protected]

BEFORE USING THIS PRODUCT

Have You Used EDCO’s Online Customer Support??

Содержание TG-10

Страница 1: ...ailable in Gasoline Propane and Electric E TG10 I 0119 E SPTS I 0809 EQUIPMENT DEVELOPMENT CO INC READ AND UNDERSTAND THE OPERATOR S SAFETY MANUAL THOROUGHLY BEFORE ATTEMPTING TO OPERATE THIS EQUIPMEN...

Страница 2: ...must wear approved safety equipment appropriate for the job such as hard hat and safety shoes when conditions require Hearing protection MUST be used when operational noise levels of this equipment m...

Страница 3: ...ns shown may be different from the actual machine Toll Free Voice 1 800 638 3326 Fax 1 800 447 3326 Figure 1 Safety Information 2 Table of Contents and Specifications 3 Safety Guidelines 4 Operating I...

Страница 4: ...the oper ator from inhaling the airborne material when operating this machine Inspect the work surface for cracks uneven joints and foreign objects such as nails screws and pipes Damage to the disc a...

Страница 5: ...on after first 4 hours of use with factory new equipment or after installing new belts Inspect the work area Inspect work area carefully before starting to grind EDCO will not be held responsible for...

Страница 6: ...rottle back to idle and sit machine back on surface Increase speed to operating position MAXIMUM 3400RPM s begin grinding Refer to tachometer Figure 3 1 for operating speed To Stop the Propane Model N...

Страница 7: ...easons the operator should wear an applicable respirator The dust may contain chemicals known to cause serious illnesses including Silicosis a fatal disease of the lungs Check the chemical properties...

Страница 8: ...DCO representative Rigid Head can be used on uneven expansion joints high spots joint curls and bridge decks removing coatings and grinding rough concrete surfaces Use with a vacuum or water for dust...

Страница 9: ...coatings PCD ACCESSORY Extremely Aggressive Removal Digs through industrial strength coverings water proofing membranes thick epoxies and much more Leaves a textured concrete surface EDCO ARROW Hard g...

Страница 10: ...off balance After every use Inspect for lash in head Does head move up down Figure 12 Verify that jam nuts items 8 on page 10 in Parts Breakdown are tight and there isn t any play Allowing these nuts...

Страница 11: ...n place until belts are tight and retighten engine mounting bolts Reinstall belt cover and tighten hardware After four hours of use retighten belts Engine Air Filter Inspect the air filters Figure 16...

Страница 12: ...kground with white pictogram This symbol means that proper breathing protection or engineering controls must be worn used during the operation of this equipment there is a potential risk of operator l...

Страница 13: ...and head protection should be used Yellow background with black pictogram and black outline This symbol means explosive and hazardous vapors are present Caution should be exercised to prevent personal...

Страница 14: ...CO Dealers only When applicable Before Operation After First 4 Hours Every 8 Hours Weekly As Necessary Adjust Wheel Height X X X X X X X Inspect Entire Machine Check Oil Fuel Levels Inspect Propane Co...

Страница 15: ...the manufacturers suppliers OSHA NIOSH and occupa tional and trade associations Water should be used for dust suppression when wet grinding cutting drilling is feasible When the hazards from inhalatio...

Страница 16: ...Page 16 E TG10 I 0119 800 638 3326 edcoinc com techsupport edcoinc com EQUIPMENT DEVELOPMENT CO INC NOTES This page intentionally left blank...

Страница 17: ...E TG10 I 0119 E SPTS I 0809 800 638 3326 edcoinc com techsupport edcoinc com Page 17 EQUIPMENT DEVELOPMENT CO INC NOTES This page intentionally left blank...

Страница 18: ...Page 18 E TG10 I 0119 800 638 3326 edcoinc com techsupport edcoinc com EQUIPMENT DEVELOPMENT CO INC NOTES This page intentionally left blank...

Страница 19: ...alties and expenses Purchaser shall be responsible for collecting and or paying any and all such taxes whether or not they are stated in any invoice for the Products Unless otherwise speci fied herein...

Страница 20: ...ning Decal Scanning this code provides owner s information videos and other training content anywhere anytime on your mobile device JOIN EDCOed com is a free 24 hour training space Each certification...

Отзывы: