Printed in USA
TVW
©2009
Page 11
E-CPM-4-8-10-SL8-I-0309
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com
Email: [email protected]
ScariLite-8/CPM-8 DRUM REMOVAL / REPLACEMENT
1. Remove plastic plug from belt guard, set aside for later use.
2. Use a socket wrench to loosen
left-hand thread
retaining nuts. Be sure the socket is over the outer retaining nut
only. The outer retaining nut has to be loosened fi rst and removed, then remove the second retaining nut, use
another wrench to hold the other end of the shaft during this procedure.
3. Be careful not to damage threads on end of shaft when removing or installing the drum. Support the weight of the
drum to minimize the possibility of damage.
4. With the
left-hand thread
retaining nuts removed, use a socket wrench to turn the other end of the shaft in a
clock-
wise
direction for removal. Support drum during shaft removal so the drum will not fall when the shaft is removed,
possibly causing damage to machine and personal injury.
5. Once the drum is removed, maintenance and/or cutter replacement can be performed.
6. Reverse this procedure for reassembly insuring the drive studs are lined up with drive holes in drum before insert-
ing the main shaft. Be sure to install plastic plug removed in step #1.
WRONG
RIGHT
TILT MACHINE FORWARD
To remove cutter drum assembly or perform drum maintenance
DO NOT TILT CPM-8 ON TO HANDLE
Engine damage and/or operator injury may result.