Vital Signs Monitor User Manual Installation
- 9 -
Chapter 2 Installation
NOTE:
The monitor installations and settings must be configured by the authorized hospital
personnel.
2.1 Initial Inspection
Before unpacking, check the packaging and ensure that there are no signs of mishandling or
damage. If the shipping cartons are damaged, contact the carrier for compensation and package
them again.
Open the package carefully and remove the monitor and accessories. Check that the contents are
complete and that the correct options and accessories have been delivered.
If you have any question, please contact your local supplier.
2.2 Mounting the Monitor
If all situations are normal, please place the monitor on a flat, level surface, on a trolley or mount
on a wall. About how to install the trolley or wall mount for the monitor, please refer to
Trolley
Installation Guide
or
Wall Mounting Bracket Assembly Instruction.
WARNING
1 The wall mounting bracket can be fixed only on a concrete wall.
2 The safe loads of the wall mounting bracket and the trolley are 7.5 kg and 11 kg
respectively. Exceeding the safe load may cause bracket to fail and the device to fall.
2.3 Connecting the Power Cable
Connection procedure of the AC power line is listed below:
1
Make sure the AC power supply complies with the following specifications: 100 V-240 V~,
50 Hz/60 Hz.
2
Connect the power cord provided with the monitor. Connect the power cord to connector of
the monitor. Connect the other end of the power cord to a grounded power outlet.
NOTE:
1 Connect the power cable to the socket specialized for hospital use.
2 Only use the power cable supplied by EDAN.
2.4 Checking the Monitor
Make sure there is no damage on the measurement accessories and cables. Then turn on the
monitor, check whether the monitor can start normally. Make sure all alarm lamps light up and
the alarm sound is heard when turning on the monitor. Please refer to chapter
Testing Alarms
.