ECR International Olsen OSVB II Series Скачать руководство пользователя страница 21

21

ELECTRICAL WIRING

Electrical Wiring
See wiring diagram Figure 12 page 23 for details. 

Refer to Ladder Diagram from document envelope 

received with boiler.

Electrically bond boiler to ground in accordance with       

requirements of authority having jurisdiction.  Refer to:

USA- National Electrical Code, ANSI/NFPA 70.

Canada - Canadian Electrical Code, Part I, CSA C22.1:

Safety Standard for Electrical Installations.

If any of the original wire as supplied with this appliance 

must be replaced, it must be replaced with type 105°C 

thermoplastic wire or its equivalent
Circulator harness is factory wired to control module. 

Connect harness to circulator in field. See Figure 11. 

WARNING

Electrical shock hazard.  Turn OFF electrical power 

supply at service panel before making electrical  

connections.  Failure to do so could result in death 

or serious injury.

!

Thermostat Installation

1.

Thermostat should be installed on an inside wall about

four feet above the floor.

2.

NEVER install a thermostat on an outside wall.

3.

Do not install a thermostat where it will be affected

by drafts, hot or cold pipes, sunlight, lighting fixtures,

televisions, a fireplace, or a chimney.

4.

Check thermostat operation by raising and lowering

thermostat setting as required to start and stop the

burners.

5.

Instructions for the final adjustment of the thermostat

are packaged with the thermostat (adjusting heating

anticipator, calibration, etc.)

6.

Set heat anticipator at .2 amps. 24 volt thermostat

connects to yellow low voltage wires labled T.

Electric Power Supply

Run a separate 115 volt circuit from separate over current 

protective device 15 ampere circuit in electrical service 

entrance panel. 

J BOX 

L1 & L2

TRANSFORMER

THERMOSTAT WIRES

CIRCULATOR 

HARNESS

TRANSFORMER LINE VOLT

BLOWER

TRANSFORMER 

SECONDARY

Figure 11   - Control Module Panel

LWCO kit 550002998

 

includes wiring instructions and 

diagrams.
Connect 115 volt power supply to terminals L1 (HOT) and 

L2 inside J box.
Run 14 gauge or heavier copper wire from boiler to 

grounded connection in service panel or properly driven 

and electrically grounded ground rod.

Содержание Olsen OSVB II Series

Страница 1: ...rs INSTALLATION OPERATION MAINTENANCE MANUAL Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com Models OSVB 2 OSVB 3 OSVB 4 OSVB 5 OSVB 6 OSVB 7 A...

Страница 2: ...ch if not avoided could result in minor or moderate injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury DANGER Indicates a hazardous situation w...

Страница 3: ...use with Natural and Propane Gases Constructed and hydrostatically tested for maximum working pressure of 50 psi in accordance with A S M E Boiler and Pressure Vessel Code Section IV Standards for ca...

Страница 4: ...4 DIMENSIONS Model Width A OSVB 2 11 OSVB 3 14 1 4 OSVB 4 17 1 2 OSVB 5 20 3 4 OSVB 6 24 OSVB 7 27 1 4...

Страница 5: ...h respect to heat distribution system as practical 7 Verify you have the right size boiler before starting installation See rating and capacity table 8 When installed in utility room door should be wi...

Страница 6: ...communicating directly or by ducts with outdoors Two Permanent Opening Method Provide opening commencing within 12 inches of top and second opening commencing within 12 inches of bottom enclosure Dire...

Страница 7: ...ve See Figure 2 Use or larger pipe Use pipe suitable for temperatures of 375 F 191 C or greater Individual boiler discharge piping shall be independent of other discharge piping Size and arrange disch...

Страница 8: ...HEIGHT FOR LOW WATER CUTOFF PROBE Figure 3 Forced Hot Water Typical Piping LIMIT SENSOR MINIMUM HEIGHT FOR LOW WATER CUTOFF PROBE Figure 4 Forced Hot Water Typical Piping With Zone Control Valve INST...

Страница 9: ...5 Boiler connected to heating coils located in air handling units exposed to refrigerated air circulation piping system shall be equipped with flow control valves or other automatic means to prevent...

Страница 10: ...stem 6 Vent connector from boiler to chimney should run as directly as possible with as few elbows as possible 7 Where possible it is recommended to common vent water heater and boiler Consult appropr...

Страница 11: ...s of the apex Boiler Water Heater Chimney CHECK YOUR CHIMNEY For boilers for connection to gas vents or chimneys vent installations shall be in accordance with Venting of Equipment of the National Fue...

Страница 12: ...m exhausts so they will operate at maximum speed Do not operate a summer exhaust fan Close fireplace dampers 4 Place in operation the appliance being inspected Follow the lighting instructions Adjust...

Страница 13: ...eter 90 elbow or 3 feet of straight pipe for 3 diameter 90 elbow 2 3 4 5 Section Boilers use 3 vent pipe for 6 7 Section Boilers use 4 vent pipe CHOICE OF VENT PIPE MATERIAL U L Listed Z Flex Z Vent S...

Страница 14: ...er A A 90 elbow pointing down fitted with a minimum 1 4 mesh screen to keep out rodents and birds The elbow shall be of the same material and size as vent pipe The elbow exit should be at least 6 away...

Страница 15: ...ained from electric meters gas meters regulators and relief equipment See Figure 9 HORIZONTAL VENTING INSTRUCTIONS Figure 9 Horizontal Venting Clearances Canada Terminate vent system at least 6 feet 1...

Страница 16: ...before operating appliance B For Heat Fab Saf T Vent stainless steel vent pipe use a high temperature silicone sealant rated for 550 F The outside of the male end and inside of the female end of the p...

Страница 17: ...om the boiler to prevent collection of condensate throughout the assembly 7 Allow the sealant to cure for 24 hours before operating the appliance D For ProTech Systems FasNSeal stainless steel vent pi...

Страница 18: ...trols Power Venter 2 3 4 5 SWG 4D 6 7 SWG 5D Some possible reasons for using a power venter for sidewall venting 1 May be preferred by local codes 2 Need a vent piping run beyond 30 9 1m but not more...

Страница 19: ...wo pipe wrenches when making connection to gas valve to keep it from turning Install manual shut off valve in vertical pipe about 5 feet 1 5m above floor See Figure 10 Tighten all joints securely Prop...

Страница 20: ...pacity BTU Per Hour Input Includes Fittings 1 1 20 92 000 190 000 350 000 625 000 40 63 000 130 000 245 000 445 000 60 50 000 105 000 195 000 365 000 Table 6 PROPANE GAS Length of Pipe Ft Pipe Capacit...

Страница 21: ...ve the floor 2 NEVER install a thermostat on an outside wall 3 Do not install a thermostat where it will be affected by drafts hot or cold pipes sunlight lighting fixtures televisions a fireplace or a...

Страница 22: ...water temperature reaches high limit set point high limit contacts open cutting power to blower and pilot control Burners extinguish and blower stops Circulator pump continues to run as long as the t...

Страница 23: ...23 WIRING DIAGRAMS Figure 12 Control Module Damper is not an option...

Страница 24: ...s Repeat until you have covered every radiation unit in system End at highest unit in system If units have automatic vents manual venting is unnecessary but it will speed up proper filling of system I...

Страница 25: ...ob WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life This appliance is equipped with an ignition device whi...

Страница 26: ...justment and are not equipped with primary air shutters Main burner flames form sharp blue inner cones in softer blue outer mantel with no yellow Puffs of air from blow ing on flame or stamping on flo...

Страница 27: ...supply to burners 3 Turn your thermostat up to call for heat and let your boiler run until temperature of water reaches limit setting Gas valve shuts off and circulator keeps running until thermostat...

Страница 28: ...eft in to freeze will crack pipes and or boiler Cleaning Your Boiler And Burners Flue passages between sections should be examined yearly and cleaned if necessary To clean Remove burners pilot and ven...

Страница 29: ...ctrical contact Check all control terminals and wire joints Chimney flue is blocked Pressure switch will not close and pilot spark will not operate to start pilot Have your service technician check an...

Страница 30: ...as temperature changes Diaphragm type tank can be mounted on air purger fitting or at any convenient place in supply or return line AIR ELIMINATING FITTING AIR PURGER Air purger is used to remove exc...

Страница 31: ...ed Factory Pressure Switch Set point 0 4 wc for 2 5 section boilers 0 5 w c for 6 7 section boilers ROLLOUT SWITCH FLAME ROLLOUT SAFETY SHUTOFF Rollout switch is temperature sensitive fuse link device...

Страница 32: ...using wire nuts Ensure remaining Molex plug connectors have not worked loose during transit Check sensing bulb is fully inserted in well and is not loose A 3 Adjusting Settings To discourage unauthori...

Страница 33: ...ion was not detected and delay is called before retry Recycle delay Flame signal was lost and delay is called before retry 11 Wait for pressure switch to open failed to close Inducer is still off Pres...

Страница 34: ...out models must be reset through key buttons and display On retry models wait for retry or reset at thermostat Check for correct installation and wiring before replacing any component Control module c...

Страница 35: ...out Soft lockout is reset after one hour if alarm reason disappears 63 Soft lockout maximum number of recycles exceeded Soft lockout 64 Soft Lockout electronics failure On board self diagnostics detec...

Страница 36: ...lace damaged wire Check for cracked ceramic insulator which can cause short to ground and replace igniter sensor if necessary At gas valve disconnect main valve wire from MV terminal Turn on power and...

Страница 37: ...NOTES...

Страница 38: ...38 NOTES...

Страница 39: ...39 Company Address Phone Company Name Tech Initials Service Performed Date SERVICE RECORD...

Страница 40: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...

Отзывы: