![ECR International Green Mountain GMCB150 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/ecr-international/green-mountain-gmcb150/green-mountain-gmcb150_installation-operation-and-maintenance-manual_2356143077.webp)
77
10 - OPERATING INSTRUCTIONS
FXXX VALUE FUNCTION
F00
No function related.
F01
De-aeration (same function can be started also
pushing
with a long push)
F02
Manual control function
F03
(Reserved for future use)
When a parameter is selected, by pressing
, the board
exits from the Command functions menu and the related
function starts.
10.3.7 Command Functions (Service)
To enter the Command functions menu press
and
with a long push.
This function ends after 3 minutes or by pressing
and
simultaneously with a long push.
After accessing the Special functions menu
“F00”
is displayed.
Address/Page Knob is used to scroll between
FXX
parameters.
PN 240012363 REV. A [08/31/2018]
Содержание Green Mountain GMCB150
Страница 51: ...51 8 ELECTRICAL CONNECTIONS FIGURE 8 13A WIRE DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 52: ...52 FIGURE 8 13B 8 ELECTRICAL CONNECTIONS LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 55: ...55 8 ELECTRICAL CONNECTIONS FIGURE 8 15A WIRE DIAGRAM GMCB200 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 56: ...56 8 ELECTRICAL CONNECTIONS FIGURE 8 15B LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...