28
6.3 Fill Condensate Trap with Water
WARNING
Asphyxiation hazard! Fill condensate trap before
installing venting to avoid combustion products
escaping boiler. Failure to follow these instructions
could result in death or serious injury.
!
• Before venting installation the condensate trap must be
filled with water.
•
To fill the condensate trap pour water into exhaust vent
until water begins to flow through the siphon.
• Visually inspect the siphon to ensure it is full with clean
water.
• During operation check condensate trap to ensure it is
draining properly.
Note
Condensate trap must be manually filled with water
at initial start up.
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-1 CONDENSATE DRAIN ASSEMBLY
MODEL GMCB200 SHOWN (LOCATION SIMILAR IN ALL SIZES)
Pour
approximately
1 cup of water
into flue way of
boiler.
Condensate Drain
PN 240012363 REV. A [08/31/2018]
Содержание Green Mountain GMCB150
Страница 51: ...51 8 ELECTRICAL CONNECTIONS FIGURE 8 13A WIRE DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 52: ...52 FIGURE 8 13B 8 ELECTRICAL CONNECTIONS LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 55: ...55 8 ELECTRICAL CONNECTIONS FIGURE 8 15A WIRE DIAGRAM GMCB200 COMBI BOILER PN 240012363 REV A 08 31 2018 ...
Страница 56: ...56 8 ELECTRICAL CONNECTIONS FIGURE 8 15B LADDER DIAGRAM GMCB150 COMBI BOILER PN 240012363 REV A 08 31 2018 ...