![ECR International Dunkirk DCBF Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/ecr-international/dunkirk-dcbf/dunkirk-dcbf_manual_2356128007.webp)
3
Verify Contents Received ...............................................2
Table Of Contents ..........................................................3
Physical Data.................................................................4
1 - Important Information .............................................7
2 - Introduction .............................................................8
2.3 Requirements For Commonwealth Of Massachusetts: 8
2.4 Use Of Carbon Monoxide Monitor ............................8
2.5 Designated Use ....................................................8
2.6 The Unit Must Not:................................................8
2.7 Operational Features .............................................8
3 - Component Listing ...................................................9
4 - Locating Boiler .......................................................15
4.1 Boiler Location Considerations ............................15
4.2 Floor Location ....................................................15
4.3 Clearances ........................................................16
5 - Combustion Air And Vent Piping .............................17
5.1 General .............................................................17
5.2 Removal Of Existing Boiler From Common Vent
System ...................................................................18
5.3 Definitions
.........................................................18
5.4 Approved Venting Materials .................................19
5.5 Vent Termination ................................................19
5.6 Coaxial Venting Instructions .................................21
5.7 Coaxial Vent Screw Placement .............................22
5.8 Twin Pipe Systems ..............................................23
5.9 Twin Pipe Polypropylene Adapter Kit Installation............
24
5.10 Twin Pipe CPVC Adapter Kit Installation ...............24
5.11 Twin Pipe Polypropylene Adapter Kit Installation...........25
5.12 Twin Pipe Cpvc Adapter Kit Installation ......... 25
5.13 Securing Twin Pipe Polypropylene Venting ............26
5.14 Flexible Vent System ........................................29
5.15 Condensate Piping ............................................31
6 - Hydronic Piping ......................................................32
6.1 General .............................................................32
6.2 Special Conditions ..............................................32
6.3 Safety Relief Valve And Air Vent ...........................33
6.4 Trim Piping .........................................................33
6.5 System Piping ....................................................33
6.6 External Optional Low Water Cut Off
....................35
6.7 Manufacturer Recommendation - Strainer ..............36
6.8 Central Heating System .......................................37
6.9 Frost Protection Mode ..........................................37
6.11 Pump Protection ...............................................37
7 - Gas Supply Piping ..................................................38
7.1 General .............................................................38
7.2 Gas Pipe Recommendations .................................39
7.3 Leak Check Gas Piping ........................................41
7.4 Gas Orifice
........................................................41
8 - Electrical Connections ............................................42
8.1 General .............................................................42
8.2 Electrical Connections .........................................42
8.3 Access To Connection Block..................................43
8.4 Main Supply Connection ......................................43
8.5 Install Room Thermostat .....................................44
8.6 Outdoor Air Sensor (OAS) Electrical Connections ....44
8.7 Indirect Storage Tank ..........................................46
8.9 Management Of 0-10v Input ................................46
9 - Start Up Procedure .................................................48
9.1 Central Heating System Connections - Heat Only ...48
9.2 Central Heating System Connections - Combi.........48
9.3 System Start Up .................................................49
9.4 Fill Condensate Trap With Water ...........................49
9.5 Control Panel......................................................50
9.6 Prior To Commissioning .......................................51
9.7 Commissioning For The First Time ........................51
9.8 Automatic Calibration Function .............................51
9.9 Manual Calibration Function: ................................52
9.10 De-Aeration Function .........................................52
9.11 Changing The Type Of Gas .................................52
9.12 Chimney Sweep Function ..................................53
9.13 Combustion Adjustment Function (CO2%) ...........53
9.14 Check Firing Rate ..............................................54
9.15 Parameter Settings ...........................................54
9.16 Description Of Parameters: Factory Settings .........55
9.17 Adjusting Maximum Heating Power .....................57
10 - Operating Instructions .........................................58
10.1 Testing For Gas Leaks And Purging Gas Supply .....58
10.2 Boiler Operation ................................................58
10.3 Central Heating Mode ........................................58
10.4 Domestic Hot Water Mode ..................................59
10.5 Frost Protection ................................................59
10.6 Pump ..............................................................59
10.7 Low Water Pressure Sensor (Internal) .................59
11 - General Maintenance And Cleaning ......................60
11.1 Beginning Of Each Heating Season ......................60
11.2 Maintenance And Routine Servicing .....................61
11.3 Component Replacement And Cleaning ...............61
11.4 Draining The Boiler ...........................................62
11.5 Draining The Heating Circuit ...............................62
11.6 Hydraulic Unit (DHW) ........................................63
11.7 Cleaning The Cold Water Filter ............................63
11.8 Final Commissioning .........................................63
11.9 Final Assembly .................................................63
11.10 User Information .............................................64
11.11 Safety Flue Thermostat. ...................................64
11.12 Flue Pressure Switch. ......................................64
11.13 Replacement Parts ..........................................64
12 - Ratings And Capacities .........................................65
12.1 Ratings And Capacity.........................................65
12.2 Domestic Hot Water Specifications
......................65
12.3 High Altitude Ratings .........................................66
12.4 High Altitude Chart............................................66
12.5 Available Boiler Pump Head ................................67
13 - Trouble Shooting ..................................................68
13.1 Error Messages And Resetting The Boiler .............68
13.2 Anomalies Table For The Installer - Use This Table To
Report The Anomaly Values. ......................................70
14 - Glossary ...............................................................71
Appendix A - Wiring Diagrams ............................... 73-78
TABLE OF CONTENTS
240013509 REV A, [03/15/2022]
Содержание Dunkirk DCBF
Страница 2: ...DCCF 150...
Страница 4: ...DCBF 125...
Страница 38: ...34 FIGURE 6 2 Piping Diagram LWCO Location 6 HYDRONIC PIPING 240013509 REV A 03 15 2022...
Страница 77: ...73 A 1 MODEL 75 100 Heat Only APPENDIX A WIRING DIAGRAMS 240013509 REV A 03 15 2022...
Страница 78: ...74 A 2 MODEL 125 Heat Only APPENDIX A WIRING DIAGRAMS 240013509 REV A 03 15 2022...
Страница 79: ...75 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013509 REV A 03 15 2022...
Страница 80: ...76 APPENDIX A WIRING DIAGRAMS A 4 MODEL 115 Combi 240013509 REV A 03 15 2022...
Страница 81: ...77 A 5 MODEL 150 Combi APPENDIX A WIRING DIAGRAMS 240013509 REV A 03 15 2022...
Страница 82: ...78 A 6 MODEL 205 Combi APPENDIX A WIRING DIAGRAMS 240013509 REV A 03 15 2022...
Страница 116: ...32 PN 240012875 REV D 03 15 2022 CIRCULATOR CONNECTIONS WIRING DIAGRAM SINGLE ZONE CIRCULATOR WIRING USING ARGO AR822 II...
Страница 117: ...33 PN 240012875 REV D 03 15 2022 MODEL 75 100 HEAT ONLY 75 100 HEAT ONLY WIRING DIAGRAM...
Страница 118: ...34 PN 240012875 REV D 03 15 2022 MODEL 125 HEAT ONLY 125 HEAT ONLY WIRING DIAGRAM...
Страница 119: ...35 PN 240012875 REV D 03 15 2022 MODEL 165 HEAT ONLY 165 HEAT ONLY WIRING DIAGRAM...
Страница 120: ...36 PN 240012875 REV D 03 15 2022 115 COMBI WIRING DIAGRAM MODEL 115 COMBI...
Страница 121: ...37 PN 240012875 REV D 03 15 2022 MODEL 150 COMBI 150 COMBI WIRING DIAGRAM...
Страница 122: ...38 PN 240012875 REV D 03 15 2022 MODEL 205 COMBI 205 COMBI WIRING DIAGRAM...
Страница 128: ...44 PN 240012875 REV D 03 15 2022 LOW WATER CUTOFF LOW WATER CUTOFF DETAIL NO NO YES...
Страница 133: ...49 PN 240012875 REV D 03 15 2022 3 FAULT SOLUTION SECTIONS...