
30
2.2.2 External examination procedure
2.2.2.1 Unpack the dosimeter, and check if the delivery kit is complete.
2.2.2.2 Inspect for mechanical damage.
2.2.2.3 Check the condition of ABG probe’s protection gaskets. Replace
them if they are dirty or damaged.
2.2.3 Connecting to the dosimeter’s connectors.
2.2.3.1 All the dosimeter’s connectors that are not currently used should be
covered with protective plugs. Remove the plug before you connect to the connector.
Put the plug back after disconnecting from the connector.
2.2.3.2 In order to connect, insert the cable connector into the block connector
until the lock is latched that mechanically connects the two connectors. At the same
time the connectors’ red points should coincide.
Figure 2.1 – Connecting to the dosimeter’s connectors
2.2.3.3 To disconnect, remove the cable connector from the block connector
by applying force to the cylindrical part of the cable connector body. By doing so,
the lock, which mechanically connects the two connectors, will be disconnected. By
applying force to other parts of the cable connector the lock will not disconnect and,
accordingly, you will not be able to remove the cable connector.
Содержание MKS-UM
Страница 1: ...MKS U MULTIPURPOSE DOSIMETER RADIOMETER Operating manual...
Страница 2: ......