Ecotap Duo Wide Скачать руководство пользователя страница 21

21

Always perform the checks below before voltage is applied to 

the DUO charging station.

 All of the activities listed below must be performed in accordance with

    NEN 3140.

 Check whether the terminals have been connected to the wiring in the

    right order.

 Check whether the conductors on the terminals have been screwed on

    properly (4 to 5 NM).

 Check whether the grounding connector has been connected to the

    coded terminal and whether it has been connected to the grounding

    electrode or the supplied grounding device. The entire grounding system

    must comply with the NEN1010/EU/35.

 Check whether the charging station is stable.

 Check whether the seals on the charging station’s caps have been

    installed properly during installation (IP54).

 Check whether any actions still need to be performed, so that they may be

    performed safely.

 Make sure there are no obstacles surrounding the worksite.

 Before any voltage is applied to the charging station, make sure to

    contact Ecotap® B.V. by calling 0031 (0) 411-210210 so that we can

    activate that particular station’s software; we will need the station’s

    unique code to do so.

19. USER / INSTALLATION MANUAL

19.1 Mounting the casing on the foundation         

The soil must be stable and levelled.

Place the foundation level in the hole and check with a spirit level. 

Use 1 bag (20Kg) FAST-DRY CEMENT for the bottom of the foundation.

Any slight discrepancy of the level can be corrected while closing the hole 

(using the soil that was previously removed).

Place the charging station on the foundation without the 2 curved steel 

covers, and secure it using the nuts and bolts supplied (nuts to the top).

Covers can be removed by undoing 8 nuts on the inside of the charging 

station (top & bottom to the side).

Take account of the connection face of the charging station in relation to 

walls, hedges, etc.

Mount the rear cover using the nuts supplied.

Keep in mind that there is sufficient space for the operation of the charging 

station. For this we advise to keep at least 1 meter of free space around the 

charging station.

ENGLISH

Содержание Duo Wide

Страница 1: ...Laadzuil Duo Wide Handboek Manual Model 2019 YOU RE IN CHARGE...

Страница 2: ...NEDERLANDS 2...

Страница 3: ...Gebruik installatie handleiding 7 6 1 Montage op de fundatie 7 6 2 Mantelbuis monteren 11 6 3 Kabelinvoeren en vastzetten met trekontlasting 11 6 4 Aansluiten van de voedingskabel 11 6 5 Aansluiten va...

Страница 4: ...g geeft inzicht hoe de laadzuil veilig ge nstalleerd en gebruikt kan worden Deze handleiding is opgesteld zodat de werking en levensduur van de laadzuil maximaal zullen zijn Deze handleiding is met gr...

Страница 5: ...adsysteem Symbool Betekenis Let op Belangrijke instructie Elektrisch gevaar Bij onderhoud eerst spanningsvrij maken en diverse meettesten uitvoeren alvorens onderhoud te plegen Dragen van speciale han...

Страница 6: ...n gebruik gaat nemen 4 1 Veiligheidsvoorschriften Voordat u de laadzuil gaat plaatsen maak u de locatie veilig voor omstanders Laat op deze werkplek NOOIT kinderen toe Zorg dat NIEMAND die niets met d...

Страница 7: ...zijn reeds met de juiste Nm in de fabriek gecontroleerd Controleer of de aardverbinding is gemonteerd op de gecodeerde aansluitklem en is verbonden met de aardpen of aangeleverde aarding Dit geheel mo...

Страница 8: ...derd Plaats de oplaadzuil zonder de 2 gebogen stalen dekseldelen op de fundatie Dit i v m het totaalgewicht Door het losdraaien van 8 moeren aan de binnenzijde van de laadzuil kunnen de deksels worden...

Страница 9: ...9 T 1 1 ENGLISH NEDERLANDS...

Страница 10: ...10 T 1 2 ENGLISH NEDERLANDS...

Страница 11: ...st 6 5 Aansluiten van de aardpen aarddraad Monteer de aarddraad van de aansluitkabel aan de HAR Ook de aarddraad die een verbinding heeft met de geslagen aardpen aansluiten op de aardklem HAR Gepositi...

Страница 12: ...uitgevoerd Het onderhoud moet altijd voldoen en worden uitgevoerd conform NEN3140 en NEN 50110 laagspanning euro norm Controleer de oplaadzuil op lekkages Test het verwarmingselement in combinatie me...

Страница 13: ...LMR dient nog wel te worden geregistreerd Zodra de registratie is voltooid is de oplaadzuil te gebruiken met elke Elektrische Vervoer laadpas sleutel hanger EV laadpas of geschikte mobiele applicatie...

Страница 14: ...cht 66 5 kg Normen EMC richtlijn 2014 30 EU EN IEC 60950 22 2017 EN IEC61851 1 2017 EN IEC61851 22 2002 EN IEC 62196 2 2017 EN IEC 61000 6 2 2016 EN IEC 61000 6 3 2007 Al 2011 EN IEC 60335 1 2012 A13...

Страница 15: ...ions overeenstemt met de eisen van de Machinerichtlijn en de andere hierna genoemde richtlijnen en Normen Type Ecotap Laadzuil DUO Wide Ontwerpjaar 2018 Gehanteerde EG Richtlijnen Laagspanningsrichtli...

Страница 16: ...16 ENGLISH 16...

Страница 17: ...1 Mounting the casing on the foundation 21 19 2 Installing the protective casing 25 19 3 Feeding the cable and installing it with strain relief 25 19 4 Connecting the power cable to the terminals 25 1...

Страница 18: ...ation s maximum functioning and lifespan This manual was drawn up with great care However should anything remain unclear after reading it please contact your supplier before you install the charging s...

Страница 19: ...andatory 16 DEVICE DESCRIPTION 16 1 Use This charging station is especially designed for public areas The station can be installed in various environments in paved areas in open soil sand or in asphal...

Страница 20: ...ng station tools and components will stay dry when it is raining Make sure that there is no danger of anyone tripping over objects or paving while you are digging the hole for the foun dation Make sur...

Страница 21: ...he charging station make sure to contact Ecotap B V by calling 0031 0 411 210210 so that we can activate that particular station s software we will need the station s unique code to do so 19 USER INST...

Страница 22: ...22 Drawing 1 0 ENGLISH ENGLISH...

Страница 23: ...23 ENGLISH Drawing 1 1...

Страница 24: ...24 Drawing 1 2 ENGLISH ENGLISH...

Страница 25: ...in the region concerned 19 5 Connecting the earth connector earth wire Connect the earth wire of the connection cable to the main earth bar HAR Also connect the earth wire which is connected to the ea...

Страница 26: ...y with and be performed in compliance with NEN3140 and NEN50110 low voltage EU directives Check the charging station for any leaks Test the heating element and the thermostat together to make sure the...

Страница 27: ...This necessary registration can be completed by phone by calling Ecotap B V at 0031 0 411 210210 during office hours As soon as the registration has been completed the charging station can be operated...

Страница 28: ...oating Casing dimensions HxWxD 1400mm x 360mm x 200mm Weight 66 5 kg Standards BS EN 61851 1 BS EN 6185 22 Water resistance IP54 Vandalism resistance IK10 Operating ambient temperature 25 to 60 Ecotap...

Страница 29: ...standards mentioned Name Ecotap Charging station DUO Wide Designed in 2018 EC directives applied Machinery Directive 2014 35 EU EMC Directive 2014 30 EC Standards used as reference EN IEC 60950 22 201...

Страница 30: ...YOU RE IN CHARGE Contact Ecotap B V Kruisbroeksestraat 23 5281 RV Boxtel The Netherlands 31 0 411 210 210 info ecotap nl www ecotap nl...

Отзывы: