background image

 

23 

C

C

O

O

N

N

T

T

R

R

O

O

L

L

L

L

E

E

R

R

 

 

4

 

Program 

Configuration  settings  are  stored  in  non-volatile  memory.  Access 

to each submenu is protected with passcode. To enter configuration 
menu, hold 

 STOP for 8 seconds. In the menu, editing and storing 

values  is  helped  by  flashing  cursor. 

 START  button  moves  cursor 

one  position  to  the  right, 

 STOP  button  increments  selected  digit 

by  one,  cycles  between  options,  or  scrolls  to  the  next  screen  when 
the cursor is at the '>' symbol. 

Configuration menu layout is shown below. 

MENU   

Factory Setting 

1.

 

SETTINGS 

 

Settings and calibration passcode prompt 

0000 

1.

 

High pressure pump delay, s 

10 sec 

2.

 

Forward Flush 1 duration, s 

60 sec 

3.

 

Forward Flush 2 duration, s 

0 sec 

4.

 

High pressure pump power during Forward Flush 2, on/off 

off 

5.

 

Frequency of periodic Forward Flush in Service, h 

4 hour 

6.

 

Frequency of periodic Forward Flush in Standby, h 

24 hour 

7.

 

Read low feed pressure during Forward Flush, on/off 

on 

8.

 

Low feed pressure switch, NO/NC 

NC 

9.

 

Low feed pressure Fault delay, s 

3 sec 

10.

 

High feed pressure switch, NO/NC 

NO 

11.

 

Permeate backpressure switch, NO/NC 

NC 

12.

 

Backpressure Standby delay, s 

1 sec 

13.

 

Tank level switch, NO/NC 

NC 

14.

 

Tank level Standby delay, s 

1 sec 

15.

 

0…1000 μS/cm conductivity range, on/off

 

on 

16.

 

0…50 μS/cm conductivity range, on/off

 

off 

17.

 

Permeate conductivity Fault threshold, μS/c

0 uS/cm 

18.

 

Permeate conductivity Fault delay, s 

on 

19.

 

Temperature probe, on/off 

on 

1.

 

Set permeate temperature, °C (if 1.19 is set to ‘off’)

 

2.

 

Display real temperature, on/off (if 1.19 is set to ‘on’)

 

1.21

 

New settings and calibration passcode 

Содержание MO-12

Страница 1: ...Ecosoft MO 12 Industrial Reverse Osmosis System Instruction manual...

Страница 2: ......

Страница 3: ...Overview 16 2 Technical data 17 3 Operating modes 19 4 Program 23 Annex Operation record 28 This appliance is not intended for use by persons including children with reduced physical sensory or menta...

Страница 4: ...remove particles The water may be dosed with antiscalant or other RO chemicals with a dosing pump at this point Then high pressure pump feeds the water into the membrane module or membrane array in w...

Страница 5: ...sure switches float switch permeate conductivity and temperature and external inhibition Depending on these signals it chooses to run in service rinse membranes go to standby or go to fault mode Perme...

Страница 6: ...cycle flow rate m3 h 10 14 Permeate flow rate m3 h 12 16 LIMITATIONS2 Hardness 150 mg L CaCO3 Iron 0 1 mg L Manganese 0 05 mg L Silicate 20 mg L Total dissolved solids 3000 mg L Chemical oxygen demand...

Страница 7: ...ownstream union to remove the entire piping fragment leading to the vessel Remove the lid at the feed end of pressure vessel First remove spiral retaining ring by pulling bent tab towards the center o...

Страница 8: ...outlet of the RO system and run it to drain pipe Ensure air gap at the end of drain line to prevent backsiphonage Connect tube or hose to permeate outlet and extend it to permeate tank Cut or bore an...

Страница 9: ...nnect three phases and neutral to leftmost screw terminal block in the bottom row Switch on main circuit breaker in the top row Check voltage protection relay status Any LED signal except green light...

Страница 10: ...ure in the membrane module shown on pressure gauge Stop when recycle flow rate meets specification or pressure in the membrane module reaches above upper limit see table of Specifications 3 7 3 Calcul...

Страница 11: ...ts After 1 hour of operation start forward flush cycle by pressing START on controller front panel then stop the unit Switch off main circuit breaker Connect permeate tube hose to permeate tank The RO...

Страница 12: ...equirements 5 1 Operator of the unit must strictly follow these guidelines and general electrical safety precautions If power supply cord is damaged it must be replaced by the manufacturer its service...

Страница 13: ...brane element is irreparably fouled and has to be replaced 5 8 To prevent microbial contamination the unit should be operated for at least 1 hour a day In case 48 hours or longer shutdown is to occur...

Страница 14: ...tion of the arrow Extract the membrane element by pulling it at the discharge end of the vessel install new membrane element observing flow direction as indicated by the arrow fasten the caps and re c...

Страница 15: ...meet workplace standards Carry out preservative treatment of membrane elements when preparing for an extended downtime The RO machine in its original packaging can be shipped by all types of air sea o...

Страница 16: ...minals of the PCB Other Contact your dealer s product support Main circuit breaker trips Power supply does not meet system requirements The system requires clean power supply conforming to electrical...

Страница 17: ...Water quality does not meet requirements Check that the water analysis conforms with requirements in chapter 2 Damaged brine seal or membrane adapter O ring Contact your dealer s product support Foule...

Страница 18: ...ence of any of the conditions indicating risk of damage to the RO machine or improper operation performing hydraulic flushing of membranes forward flush with preset frequency and duration implementing...

Страница 19: ...Conductivity meter cond 1 white 2 black Temperature sensor temp 3 red 4 green 5 blue Pressure switch before pump 5 V 1 mA dry contact NC NO P_in 8 9 Pressure switch after pump P_max 10 11 High permea...

Страница 20: ...18 Electrical cabinet wiring diagram...

Страница 21: ...the circuit will take the controller back to the mode that had been interrupted Stop terminals can be used to connect a microswitch on pre treatment media filter a relay or other means of external co...

Страница 22: ...ansition to Standby after reading high tank level or pressure It can be manually activated while in Service by pushing START button Status of outputs in FF1 High pressure and antiscalant pumps on Entr...

Страница 23: ...mode Pushing START will abort Forward Flush 2 and bring the controller to Service or Standby depending on tank level and backpressure status STANDBY In Standby the unit is stalled and ready to resume...

Страница 24: ...and antiscalant pumps off Entry valve closed Forward flush valve closed Bypass valve closed Alarm on Fault mode can only be quit manually by pushing START Ensure the cause of fault is eliminated befor...

Страница 25: ...ion s 0 sec 4 High pressure pump power during Forward Flush 2 on off off 5 Frequency of periodic Forward Flush in Service h 4 hour 6 Frequency of periodic Forward Flush in Standby h 24 hour 7 Read low...

Страница 26: ...ush 1 duration Enter length of Forward Flush 1 0 255 seconds Forward Flush 1 will not be performed if the parameter is set to zero 1 3 Forward Flush 2 duration Enter length of Forward Flush 2 0 255 se...

Страница 27: ...1 Permeate backpressure switch This setting specifies whether backpressure switch is normally closed NC or normally open NO type 1 12 Backpressure Standby delay Specify the length of time before the c...

Страница 28: ...f permeate for correct conductivity measurement Only active if 1 19 is off 1 20 Divide temperature by 10 Temperature value 10 will be shown Only active if 1 19 is set to on 1 21 New settings and calib...

Страница 29: ...e by holding STOP for 8 seconds then skipping Settings and Calibration prompt displays Enter Maintenance passcode in the prompt Factory passcode is 0000 3 1 Schedule maintenance stop Select on to turn...

Страница 30: ...e Ecosoft RO Operation record Date and time Temperature of water Pressure Flow Conductivity of permeate Notes Feed water After prefilters Operating pressure 1 st stage concentrate 2 st stage concentra...

Отзывы: