
INSTALLATION:
(see the following diagram)
Switch off the power
Take off the sensor board-face and the nail.
Connect the power and the load wire with the sensor according to connection-wire
diagram
The sensor is fixed on the selected position.
You can switch on the power and test it after covering the board-face.
CONNECTION-WIRE DIAGRAM
(see the
right Fig)
TEST:
Turn the control-light knob anti-
clockwise on the maximum (“sun” position), turn the
time knob anti-clockwise on the minimum.
Switch on the power, the controlled load work after 5~10sec, under the no inductor
signals conditions, the load should stop working within 5~30sec.
After the first is out, make it sense again after 5~10sec. The load should work and it
stops working within 5~15sec.
Turn the light-control knob clockwise on the minimum, the inductor load should not
Correct moving orientation incorrect moving orientation
2
1
3
58.5
Содержание ECO-11
Страница 1: ...Wall PIR Sensor ECO 11 Manual ...