![ecoque 71008 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/ecoque/71008/71008_assembly-and-operation-manual_2355185006.webp)
71008
page|5
Remove 4 bolts
from top of oven (the
bolts are stored in the threaded holes
on top of the oven for transport).
2
Slide the chimney top on top of the chimney and then
attach the chimney to
the top of the pizza oven
as shown in the illustration to the right. Use the 4 bolts
removed in the previous step to attach the chimney.
Note:
The chimney can be placed so that the chimney adjustment points to the
front of the appliance or to either side.
1
2
4
Don’t forget the two
bolts on the back
Assembly
23
Assemble chimney adjustment
in base of chimney. Attach damper rod to damper plate
with 2 bolts as shown.
Unbox
the Oven Compartment and the Wood Storage
Box. Use the pull-out rods on the front and back of the
Oven Compartment to lift the Oven Compartment onto
the Wood Storage Box. This step requires
two people
.
Then use 4 bolts (the bolts are screwed in the thread
holes located in the wood storage box for transport) to
attach the oven compartment to the wood storage box
,
as shown in the diagram to the right.
5
Transport
this unit by pulling out the two handles located on the
front of this unit and lifting slightly. The unit will pivot on the wheels
and can easily be wheeled across a
smooth surface
to the desired
location. Take all necessary precautions when transporting this unit
to
avoid excessive tipping
.