11
there is adequate space on either side of the bracket to accommodate the system. You will
need approximately 6 to 12 inches on the left and 24 to 30 inches on the right.
If mounting to drywall, we recommend that you use suitable wall anchors or that you mount
a small piece of 3/4 inch plywood to the wall first, ensuring that it is securely screwed into
52 3/4 inches
from floor to
top of bracket
6 to 12 inches
clearance to
left of bracket
24 to 30 inches
clearance to right
of bracket
Содержание EP-600-TAC
Страница 8: ...8 Step 1 Pre Installation Inspection ...
Страница 16: ...16 go to next page ...