background image

 

 

 

G A S I F I C A T I O N   B O I L E R S  

EBW SERIES 

HIGH-EFFICIENCY 

WOOD-FIRED BOILERS 

OPERATOR’S 

MANUAL 

US 

Содержание EBW SERIES

Страница 1: ...1 G A S I F I C A T I O N B O I L E R S EBW SERIES HIGH EFFICIENCY WOOD FIRED BOILERS OPERATOR S MANUAL C US...

Страница 2: ...ral Avenue Post Office Box 689 Brocton New York 14716 Telephone 716 792 2094 Toll Free 1 866 818 5162 Facsimile 716 792 2098 For technical assistance call 716 792 2095 Website www econoburn com Email...

Страница 3: ...13 BOILER CONTROL 14 FIRING YOUR BOILER 15 COMBUSTION AIR NEGATIVE PRESSURE 16 CLEANING CREOSOTE BUILD UP 16 GENERAL SAFETY TIPS FOR BOILER OPERATION 17 TIPS FOR MAXIMIZING BOILER EFFICIENCY 17 BOILE...

Страница 4: ...4 CHIMNEY MAINTENANCE 22 TROUBLESHOOTING GUIDE 23 SPECIFICATIONS 24 25 ECONOBURNTM BOILER WARRANTY 26...

Страница 5: ...efficiency out of traditional wood fuel sources and will provide you with many many years of safe and cost effective space and water heating To ensure that you have a clear understanding of the operat...

Страница 6: ...QUALIFIED HEATING VENTILATION AND AIR CONDITIONING HVAC PROFESSIONAL DO NOT ATTEMPT TO INSTALL THIS UNIT YOURSELF UNLESS YOU ARE A CERTIFIED AND PROPERLY QUALIFIED HVAC PROFESSIONAL IMPROPER INSTALLA...

Страница 7: ...7 BOILER DIAGRAM...

Страница 8: ...Press Up and Down together and Programming mode is entered Any incorrect sequence or no keys for few seconds will return the display back to water temperature actual and setting for fan speed Menu hys...

Страница 9: ...es when water at or above set point in seconds P o 15 1 60 In program mode up and down arrows will adjust the Setting value within the range given in 5 deg steps except for delay and pulse menus Enter...

Страница 10: ...WOOD CHIPS MANUFACTURED LOGS SAWDUST OR PELLETS DO NOT BURN GARBAGE GASOLINE NAPHTHA OR ENGINE OIL If you are having problems with heat outputs check the moisture content of your wood Firewood moistu...

Страница 11: ...RNTM Wood Fired Boiler has been designed so that the firebox door latch remains locked preventing the firebox door from opening unless the flue draft handle see Figure 1 is first pushed inward as far...

Страница 12: ...R HANDLE AND WAITING A MINIMUM OF ONE MINUTE 1 Open the Boiler s bypass damper by pushing the flue draft handle as far to the rear of the unit as it will go See Figure A 2 Turn off the forced draft fa...

Страница 13: ...tes the highly efficient gasification process The fan remains on as long as the water temperature is below the desired water temperature Packed with the ECONOBURNTM Wood Fired Boiler is a pump which w...

Страница 14: ...pass damper open for approximately 15 to 20 minutes This will allow time to establish the coal bed above the refractory nozzle which will in turn yield the most efficient gasification You will likely...

Страница 15: ...also likely to exist where a ventilation system has been installed in the structure CLEANING CREOSOTE BUILD UP Creosote is a flammable and corrosive substance that can build up on the walls of your fi...

Страница 16: ...ing and to the Boiler Do not open the doors or damper This will stop the amount of oxygen to enter the burn chambers It is recommended to let the gravity loop handle the excess Btu s or install a batt...

Страница 17: ...O NOT OPERATE WITH FUEL LOADING OR ASH REMOVAL DOORS OPEN DO NOT STORE FUEL OR OTHER COMBUSTIBLE MATERIAL WITHIN MARKED INSTALLATION CLEARANCES INSPECT AND CLEAN FLUES AND CHIMNEYS REGULARLY CAUTION H...

Страница 18: ...r maintenance produces creosote buildup 8 Operation of unit during power failure i e manual operation of zone valves and flow check valves 9 When shutting down for extended periods clean unit thorough...

Страница 19: ...to check condition Grease door hinges annually CLEANING THE HEAT EXCHANGER Every day of boiler use the turbulator assembly should be exercised To perform this maintenance grasp the turbulator agitatio...

Страница 20: ...ng ashes cease refueling and allow the fire to die down Before opening the lower combustion chamber door ensure the fire in the boiler is completely extinguished Ashes should be placed in a metal cont...

Страница 21: ...In a few hours depending how much your boiler gasifies your sticky turbulators should free up Your best bet is to burn them over night Keep the ashes cleaned out of the combustion chamber especially...

Страница 22: ...ric damper Smoke escaping from closed boiler doors Leak in door gasket Adjust door hinges per instructions Rope seal worn Replace rope or service call Fan not functioning Thermal protection engages In...

Страница 23: ...71 1cm 287 71 1cm 297 73 7cm 32 83 8cm 39 99 1cm 28 71 1cm 297 73 7cm MaximumLoglength 21 53 3cm 217 53 3cm 217 53 3cm 24 83 8cm 33 83 8cm 217 53 3cm 21 53 3cm FireboxDoorHeight J 12 30 5cm 12 30 5cm...

Страница 24: ...ature 280 F 400 F 138 C 204 C E l e c t r i c a l D a t a BoilerPowerRequirement 110 volt 15 amp 175 ElectricalConsumption watts 100 175 175 175 200 175 AquastatOverheatSetting 220 F 104 C ElectricalC...

Страница 25: ...our part and we neither assume nor authorize any other person to assume for us any other liability in connection with the sale of our boiler This warranty shall not apply to any ECONOBURNTM boiler whi...

Отзывы: