STORM
™
- SETTLING RATE MONITOR
INSTALLATION, OPERATION & MAINTENANCE MANUAL
ESTDS-STORM-IOM - REV K
Page 4 of 31
4
INSTALLATION
4.1
STORM Panel Location
The
STORM™
unit should normally be installed on the Thickener bridge, adjacent to the centre-
well. Common installation practice is to use the bridge handrails to mount the unit. The
STORM™
cabinet is provided with four (4) mounting brackets located at the rear of each corner
of the cabinet.
Figure 4-1 : Panel Mounting Details
4.2
Sample Hose Location
The sample point should be located :-
•
In the thickener centre well.
•
In such a position as to give a good cross-section of the thickener feed.
Содержание Nalco Water STORM
Страница 28: ...STORM SETTLING RATE MONITOR INSTALLATION OPERATION MAINTENANCE MANUAL ESTDS STORM IOM REV K Page 26 of 31...
Страница 29: ...STORM SETTLING RATE MONITOR INSTALLATION OPERATION MAINTENANCE MANUAL ESTDS STORM IOM REV K Page 27 of 31...
Страница 30: ...STORM SETTLING RATE MONITOR INSTALLATION OPERATION MAINTENANCE MANUAL ESTDS STORM IOM REV K Page 28 of 31...
Страница 31: ...STORM SETTLING RATE MONITOR INSTALLATION OPERATION MAINTENANCE MANUAL ESTDS STORM IOM REV K Page 29 of 31...
Страница 32: ...STORM SETTLING RATE MONITOR INSTALLATION OPERATION MAINTENANCE MANUAL ESTDS STORM IOM REV K Page 30 of 31...
Страница 33: ...STORM SETTLING RATE MONITOR INSTALLATION OPERATION MAINTENANCE MANUAL ESTDS STORM IOM REV K Page 31 of 31...