background image

 

 

 

 

 

TABLE OF CONTENTS

 

 

 

 

 

INTRODUCTION……………………………………………………………….4 

WARRANTY  INFORMATION…………………………………………………5 

SAFETY  INFORMATION……………………………………………………6-7 

PREPARING  YOUR  WATER  BEFORE  INSTALLATION……………….8-9 

SALT  CHART  FOR  CORRECT  MAINTENANCE…………………………10 

TOOLS  AND PARTS REQUIRED  FOR  INSTALLATION………………..11 

INSTALLING YOUR SYSTEM – PLUMBING………….……………….12-13

 

ELECTRICAL………….………………14 

SPECIFICATIONS  AND  FUSE  SIZING……………………………………..15 

STARTING  THE  SYSTEM………………………………………………….…15 

GENERAL  OPERATION………………………………………………………16 

MAINTENANCE AND CLEANING………………………………………..…17

 

Содержание Aqua Balance Pure Comfort 2.0

Страница 1: ...r spas a range of 3 0 5 0 ppm of free available chlorine must be maintained KEEP OUT OF REACH OF CHILDREN READ THE LABEL AND OPERATING MANUAL BEFORE USING REGISTRATION NO 29705 PEST CONTROL PRODUCTS A...

Страница 2: ...ECOLAB Aqua Balance Pure Comfort Mineral Pool Spa System USER S GUIDE MODEL2 0...

Страница 3: ...EPARING YOUR WATER BEFORE INSTALLATION 8 9 SALT CHART FOR CORRECT MAINTENANCE 10 TOOLS AND PARTS REQUIRED FOR INSTALLATION 11 INSTALLING YOUR SYSTEM PLUMBING 12 13 ELECTRICAL 14 SPECIFICATIONS AND FUS...

Страница 4: ...5 0 ppm of free available chlorine must be maintained KEEP OUT OF REACH OF CHILDREN READ THE LABEL AND OPERATING MANUAL BEFORE USING REGISTRATION NO 29705 PEST CONTROL PRODUCTS ACT WARNING Operating t...

Страница 5: ...Place St Paul MN 55102 INTRODUCTION Ecolab Inc 1 Ecolab Place St Paul MN 55102 1 800 354 5326 Patent US 6821398B2 EPA Est 082229 GA 001 NSF 50 UL 1081 listed Congratulations on purchasing your new EC...

Страница 6: ...es of the titanium electrodes will not be honored if the system is operated in water temperatures lower than 15 degrees C ECOLAB warranties of the titanium electrodes will not be honored if the system...

Страница 7: ...ystem never operates when the pumps are off All boxes on your ECOLAB system contain high voltage components Never open any box while power is on WARNING Heavy pool and or spa usage and higher temperat...

Страница 8: ...duals can be protected from destruction by sunlight by addition of stabilizer cyanuric acid NOTE FOR USE ON SPAS For proper sanitation spas must be completely drained periodically The number of days b...

Страница 9: ...ntil the salt has all dissolved You must never leave large amounts of salt on the surface of the pool as this may cause damage to the pool surface When you add the initial load of salt you will need t...

Страница 10: ...e frequent calibration to ensure accurate readings failure to calibrate the equipment will result in inaccurate readings How to Calculate volume of a pool For a rectangular shaped pool Length ft x Wid...

Страница 11: ...60 180 200 4400 6 60 120 180 240 300 360 420 480 540 600 4000 10 100 200 300 400 500 600 700 800 900 1000 3800 12 120 240 360 480 600 720 840 960 1080 1200 3500 15 150 300 450 600 750 900 1050 1200 13...

Страница 12: ...you will need the following items not included to complete the installation Polypropylene tubing Flex PVC tubing Wall anchors Disconnect box fuse box conduit wiring and related material to supply 220v...

Страница 13: ...uction and ultimately reducing flow to the point that the flow switch de activates the system 3 If you elect to use the bypass plumbing method 2 you will need to purchase a butterfly valve based on th...

Страница 14: ...LER PRESENT THE OUTLET LINE THAT FEEDS THE CONTROLLER PROBES COULD BE CONNECTED TO THE RECTIFIER BYPASS MANIFOLD PLUMBING METHOD 2 NOTES THE RECTIFIER COOLING LINES MUST BE CONNECTED FROM THE SUCTION...

Страница 15: ...110 120v outlet As above the cord labeled ORP must be plugged into a controller or a 120v outlet Your ECOLAB system must be wired to the main pump power supply so that if the pump is shut down the pow...

Страница 16: ...for it If you are running your system manually you will need to find the point at which you keep a satisfactory level of chlorine in the water It may take several days to find this point If your ECOLA...

Страница 17: ...ide of box 1 you will notice the amperage needle of the gauge on box 3 increases or decreases Higher amperage higher chlorine production Normal operating amps and volts for this model device are 2 0 1...

Страница 18: ...m minerals will build up on the plates especially at the top of the cell This buildup needs to be cleaned by removing the cell from the housing and soaking it in a dilute muriatic solution 1 5 for abo...

Отзывы: