PowerSpout
TRG installation 2018
Last revised July 2018
© 2018 EcoInnovation Ltd (NZ)
Page 36
2.3.8.
Installation details
We recommend you take note of and let us know the final system details (as below) for
future reference and to help with ordering replacements or upgrading the system.
This information and a picture of the final installation are required for all warranties greater
than 12 months.
Installation details
Serial number ______________________
Date installed
Location of installation
Pipe inside diameter
m or inch
Pipe length
m or ft.
Jet size
mm or inch
Static pressure on gauge (turbine off)
kPa or PSI
Dynamic pressure on gauge (turbine running)
kPa or PSI
System nominal voltage
V
Cable length
m or ft.
Cable wire size
mm
2
/conductor
Generator name (e.g. 100-14S-1P delta)
100/80/60/60dc - ____S-____P delta/star
Performance data
Flow rate of water through turbine
l/s or gal/min
Voltage on DC rectifier pins at hydro
V
Voltage at battery terminals
V
Current generated
A
We would also like you to let us know your performance data so that we can determine
conversion efficiency at your site. This helps us refine our calculations for future clients. As
every site is different, efficiency will vary from site to site.