pag.15
LB 509
BLU 1700.1 - 2000.1 PR / MD
B
E
D - D1
F
G
C
B
A
I
L
M
H
N
O
OVERALL DIMENSIONS
MODELS
A
B
C
D
D1
E
F
G
H
I
L
M
N
O
BLU 1700.1 PR/MD
710
385
325
340
540
660
250
398
283
*
240
240
M14
125
250
BLU 2000.1 PR/MD
730
405
325
346
546
660
270
398
283
240
240
M14
125
250
*
Optional (only 1700.1)
D
= Short head
D1
= Long head
CONNECTION TO THE GAS PIPELINE
Once connected the burner to the gas pipeline, it is necessary to control that this last is perfectly sealed. Also verify that
the chimney is not obstructed. Open the gas cock and carefully bleed the piping through the pressure gauge connector,
then check the pressure value trough a suitable gauge. Power on the system and adjust the thermostats to the desired
temperature. When thermostats close, the sealing control device runs a seal test of valves; at the end of the test the bur-
ner will be enabled to run the start-up sequence.
ELECTRICAL CONNECTIONS
All burners factory tested at 400 V 50 Hz three-phase for motors and 230 V 50 Hz monophase with neutral for auxi-
liary equipment. If mains supply is 230 V 50 Hz threephase withuot neutral, change position of connectors on burner
as in fig. Protect burner supply line with safety fuses and any other devices required by safety standards obtaining in the
country in question.
Once connected the burner to the gas pipe make sure that there are no leakages. Air bleed the pipe through the pressure
gauge fixing point and check the pressure with a pressure gauge . Turn the thermostats to the desired temperature.
PRELIMINARY CHECKS
- Before starting up the boiler check the following: - gas type and feed pressure; - gas valves closed;
- the seals in the pipe fittings; - gas pipe breather and input pressure; - that the cable complies with the diagram and the
phase and neutral wires correspond; - that the burner shuts down when the boiler thermostat opens;- the seal of the
boiler furnace which prevents air from entering; - the seal on the flue-boiler pipe fitting; - the condition of the flue (sea-
led, free from blockage, etc ).If all these conditions are present, start the burner. The control device starts the motor to
carry out prewashing of the combustion chamber. During this prewash period (about 30 seconds) the device checks
that air pressure is correct via the air pressure switch. At the end, it supplies power to the transformer and opens the gas
valves. The flame must be lit and stabilize within 3 seconds, which is the device's safety time limit. Check to ensure the
flame is lit before placing any control instrument in the flue. Adjust and check the gas flow necessary for the boiler at
the meter. Adjust the air flow according to the gas flow to obtain correct combustion.
BURNER START-UP
ADJUSTING THE COMBUSTION PROCESS
IMPORTANT:
to obtain the right adjustment of the combustion and thermal capacity it is important to analyze the
reducts of combustion with the aid of suitable instruments. The combustion and thermal capacity adjustment is done
simultaneously, together with the analysis of the products of combustion, making sure that the measured values are sui-
table and that they comply with current safety standards. On this matter, please refer to the table and figure below.
THESE OPERATIONS MUST BE DONE BY PROFESSIONALLY-QUALIFIED TECHNICIANS.
Содержание BLU 1700.1 MD
Страница 57: ...pag 57 LB 509 BLU 1700 1 2000 1 PR MD ABCD ...
Страница 58: ...pag 58 ABCD LB 509 BLU 1700 1 2000 1 PR MD ...
Страница 59: ...pag 59 LB 509 BLU 1700 1 2000 1 PR MD ABCD ...