background image

Prior to installation

•  This unit is intended to be installed underneath a conventional 

kitchen sink. However as a refrigeration unit it relies upon air 
exchange to function properly, ensure adequate ventilation is 
provided.

•  When fitting this unit in a cupboard leave 25mm in the front and 

back of the unit and 50mm either side of the unit.

•  Only Teflon tape to be used where necessary. Under no    

    

circumstances is plumbing paste to be used. 

Product Information

•  The 350 kPa Pressure Limiting Valve supplied must be fitted. 
•  Do not tip chiller unit on its side or end, if this has happened 

reposition and wait 30 minutes for the oils to return.

•  We recommend changing the filter cartridge every 12 months.
•  The condenser should be periodically cleaned with a brush air 

hose or vacuum cleaner. Disconnect the power supply during 
cleaning.

•  If the supplied power cord is damaged, it must be replaced by an 

electrician.

•  Temperature control is adjustable, with a cooling capacity of 2-12 

degrees Celsius. 

Installation Instructions

1.  Do not plug in the unit or turn on the power until the installation    
     process is complete. 

2.  Position the unit underneath the sink so that the chiller air-intake  
     is as close as possible to the front of the cupboard. The cupboard  
     floor which extends past the toe-board must have a slot cut into it  
     to provide the necessary ventilation (preferably at least 20mm  
     wide by 3/4 the width of the cupboard door).
3.  Ensure the connecting lines are thoroughly flushed to remove all  
     foreign matter before connection to the chiller.
4.  Position the tap in the desired location. Drill an 11mm hole to fit.
5.  Secure the 10” Water Filter, with the bracket and screws  

   

     provided, to the cupboard wall in a handy position relative to the

Содержание EC 30

Страница 1: ... to installation Important This unit must be installed by an authorised plumber The unit to be connected in accordance with AS 3500 4 1 or AS NZS 3500 4 2 Do not turn on power to this chiller until water is flowing from the tap Please leave these instructions with the owner WHAT S IN THE BOX 1 x EC 30 Chiller Unit 1 x UBFKI 10C Filter Kit kit includes EC 02 Chiller Filter Tap and EB FMP 350 kPa PL...

Страница 2: ...e or vacuum cleaner Disconnect the power supply during cleaning If the supplied power cord is damaged it must be replaced by an electrician Temperature control is adjustable with a cooling capacity of 2 12 degrees Celsius Installation Instructions 1 Do not plug in the unit or turn on the power until the installation process is complete 2 Position the unit underneath the sink so that the chiller ai...

Страница 3: ...ect the 1 4 pipe from the filter outlet to the chiller inlet c Connect the 1 4 pipe from the filter inlet to the 350 kPa PLV d Connect to the mains water supply using Plumber s Mate fitting provided 8 Open tap until water is flowing from the spout Once the water is flowing freely out of the tap plug in the unit to a standard 3 Pin 10 Amp Power Socket and switch on the power Allow 20 minutes for th...

Страница 4: ...lace filter cartridge Contact Supplier for a service No water Water has been turned off Blocked filter Check Mains water supply Replace filter cartridge Water boilers Water chillers Boil Hot units Boil Hot Chill units Parts Accessories For more information about Ecoboil and our products visit our website or contact us Ecoboil Appliances Limited Phone 09 238 2209 Fax 09 282 4073 Mail P O Box 940 Pu...

Отзывы: