-8-
Operation
Maintenance
LED Display Operation
Assuming all connections are correct and tightly secured, Locate the
power button on the solar inverter and press power switch to the ON
position. The following describes the basic operation of the solar invert-
er charger.
In order to maintain optimal long-term performance, it is recommended
to perform inspections of the following items twice a year.
1. Make sure that the air flow around the solar inverter is not blocked
and remove any dirt or debris from the radiator.
2. Check all terminals to see if there is corrosion, insulation damage,
high temperature or combustion / discoloration signs, tighten the termi-
nal screws.
(1)
Solar input voltage
(2)
Present battery capacity
(3)
AC output voltage
(4)
Load power