![Eco Tech DW 45 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/eco-tech/dw-45/dw-45_manual-for-use-and-maintenance_534274006.webp)
ENGLISH
6
INSTRUCTIONS FOR USE
Prior to starting the engine and beginning to work, make sure to perform the checks listed below:
•
Check the integrity of the cable outlet spout on the cable laying blade (Fig. 2). Check in
particular the integrity of the hose inside of the blade. If damages are found, replace it. Also
check that there are no cuts along the entire edge of the blade spout; make sure the edge is
not sharp or jagged. Replace the blade if damaged.
Fig. 2
•
Make sure the oil level has not lowered below the minimum: unscrew the cap (fig.1 n.11),
clean the dipstick with a rag then tighten back the plug. Unscrew again and make sure the oil
level stays between the minimum and maximum level notches. Should the level be below the
minimum limit, top up the oil to the optimum level. (require the suitable oil type to your
dealer).
WARNING!!! THE MACHINE IS SUPPLIED WITH NO OIL
•
Make sure that all screws are properly tightened.
•
Check that all levers are placed in neutral position (fig.1 n.6/n.9).
•
Clean the air filter if there are impurities (check the booklet of the engine).
•
Fill the machine with fuel using a funnel provided with filter.
•
Open the fuel tap (check the booklet of the engine).
•
To start the engine when cold, position the gas lever (fig.1 n.3) to
START.
•
Grip the engine starting knob (fig.1 n.2) and pull forcefully.
•
Wait a few minutes to reach the operating temperature before setting it to the
maximum speed.
IT IS RECOMMENDED TO ALSO FOLLOW THE INSTRUCTIONS DESCRIBED IN THE ENGINE BOOKLET.
Before starting to work, place the cable into the cable winder, adjust the burial depth, tie the cable
end to a stake, make sure there are no people, animals or things at least 20 meters around the
machine, then start the engine and, once it has warmed up, start operation. Lower completely the
cutter rotation clutch (fig.1 n.9),
engage it to fully forward (fig.1 n.1) and start working by always paying utmost attention. Read
carefully the description of the operations given below.
During the summertime or in the presence of dry soil, it is recommended to abundantly water the
ground the day before performing the work.