Chapter IV Page 2
•
Check that the membrane permeation tube fits properly into the O-rings inside the
sealing caps (3).
•
Place the membrane and screw the end caps previously removed, with the pivot
wrench.
•
Repeat the operation with the other vessels.
•
Reassemble the vessels on their supports (4).
•
Adjust properly the stainless steel connectors (5) and the blue Ø8mm polyamide
produced water tube (6) between the vessels and tighten the screws that link the
flanges to their brackets.
•
Reassemble the membranes set to the frame fixing it with its screws.
•
Reconnect the high pressure hoses, making sure the fitting nuts are well tight.
•
Connect the fresh water outlet.
NOTE:
De location of the seal on the membrane, is different than in the 2540 Standard
models used by other manufacturers, it is placed on the side marked as (OUTLET)
with its lips against the water flow direction (FLOW).
Before restarting the unit, make sure the valve (11) (see drawing in Chapter I, Page 1) is
in
TEST
position and proceed as indicated in Chapter I section 5 FIRST START-UP.
WARNING.- The membrane may have air inside and it needs a few minutes to be
completely taken out.