ECO REMOVAL SYSTEMS ECOGPB Скачать руководство пользователя страница 4

6

5

SAFETY

OPERATION

The following symbols are used throughout this guide as indicated in their descriptions:

HAZARD INTENSITY LEVEL

There are three levels of hazard intensity identified by signal words 

WARNING

 and 

CAUTION

 and 

FOR SAFETY.

The level of hazard intensity is determined by the following definitions: 

WARNING

 - Hazards or unsafe practices which COULD result in severe personal injury or death.

CAUTION

 - Hazards or unsafe practices which could result in minor personal injury or product or  

property damage.

FOR SAFETY

: To Identify actions which must be followed for safe operation of equipment. Report machine 

damage or faulty operation immediately. Do not use the machine if it is not in proper operating condition. 
Following is information that signals some potentially dangerous conditions to the operator or the equipment. 
Read this information carefully. Know when these conditions can exist. Locate all safety devices on the machine. 
Please take the necessary steps to train the machine operating personnel.

•  FOR SAFETY - DO NOT OPERATE MACHINE:
•  Unless Trained and Authorized.
•  Unless Operation Guide is Read and understood.
•  In Flammable or Explosive areas.
•  In areas with possible falling objects
•  When in an area where there is a possibility of an electrical storm.

WHEN SERVICING MACHINE

Avoid moving parts. Do not wear loose clothing; jackets, shirts, or sleeves when working on the machine.  
Use manufacturer approved replacement parts.

 

WARNING

:

 

 

CAUTION

:

 

 

WARNING HOT AREA

:

 

Do not tamper with the lance at any time, 
refer to manufacturer.

When red label is showing black (hot) the 
exhaust is HOT ( please note it will take 
approximately 3 minutes to heat up the 
boiler and the label to change to black)
When the black ( HOT) disappears and 
turns to red the boiler is now cold ( please 
note the time for this will depend on the 
surrounding environment)

Charging the machine

Plug the charger into the charging port on the 
machine.

It will take approximately 4 hours for the battery to 
fully charge.

A fully charged battery will last for 8 hours. Charger 
will show a red light while charging and a green light 
when fully charged.

If charger displays anything other that the listed 
colours, contact ERS.

Cleaning Gum

Ensure the battery has been charged and 
disconnected from the charger (ensure this is done on 
a even surface)

Place on a even surface and unzip the backpack 
and undo the velcro which holds the pipe in place. 
Unsrew the lid on the detergent bottle and insert the 
bottle into the the large pocket.

Screw the cap onto the bottle (which is attached to 
the unit by a tube) and make sure the tube is pushed 
as far down the bottle as possible.

Srew the LPG gas bottles onto the gas valve manifold 
and tighten hand tight and place into the 2 circle 
pockets.

Secure the pipe using the velcro to the backpack Turn 
the gas valves on by turning clockwise ( please note 
the gas is now on)

Screw in the appropiate brush on to the end of the 
nozzle on the lance.

Zip the rucksack back up.

Operator to place rucksack on thier back and adjust 
straps accordingly (please see page 8 )

WARNING 
Always remove the brush when its cold. Switch 
off  the machine and hold in a upright postion 
for at least 3 minutes. Always remove the brush 
by wearing gloves.

Содержание ECOGPB

Страница 1: ...INSTRUCTION MANUAL Steam Operated Machine Original Instructions Lance weight 2 8kg ECO REMOVAL SYSTEMS Backpack fully loaded 7 5kg...

Страница 2: ...systems com and click the warranty option Warranty covers parts and labour for a period of 12 months Please note this on all fair usage Please contact us to extend your warranty The Midi should be ser...

Страница 3: ...wn The rechargeable battery has been designed to be fully charged BEFORE each use Only use manufacturer approved solution and fuel for the safe operation of the machine Using other consumable items in...

Страница 4: ...me refer to manufacturer When red label is showing black hot the exhaust is HOT please note it will take approximately 3 minutes to heat up the boiler and the label to change to black When the black H...

Страница 5: ...lution is empty in the backpack 1 BATTERY CHARGE INDICATOR 2 ON OFF BUTTON 3 RED IGNITION BUTTON 4 YELLOW FLUID CONTROL DIAL 5 FLUID LEVEL INDICATOR LIGHT 1 2 3 4 5 Adjusting the Machine Unclip waist...

Страница 6: ...s ECOOSB 1 Oil Service Box 2x gas cartridges 2x detergent bottles 1x ECOOBSS brushes ECOGPB 1 General Purpose Service Box 2x gas cartridges 4x detergent bottles 1x ECOOBPP brushes ECORNB 20 Brush Roun...

Страница 7: ...12 11 SAFETY DATA SHEET SAFETY DATA SHEET According to 1907 2006 EC Article 31 GUM REMOVER SOLUTION...

Страница 8: ...14 13 SAFETY DATA SHEET SAFETY DATA SHEET According to 1907 2006 EC Article 31 GUM REMOVER SOLUTION...

Страница 9: ...remove subject to hospital for specialised treatment Carbon Monoxide Name and description RECEPTACLES SMALL CONTAINING Ingestion Remove subject to fresh air as soon as possible and follow the guidelin...

Страница 10: ...18 17 NOTES DECLARATION OF CONFORMITY READ AND SAVE THESE INSTRUCTIONS and keep with the machine at all times NOTES...

Страница 11: ...19 www ecoremovalsystems com 0121 565 3087 sales ecoremovalsystems com 126 Oldbury Road Smethwick West Midlands B66 1JE...

Отзывы: