Upon  completion  of  the  installation,  allow  a 

suitable period of time for any fire cement and 

mortar to dry out.  

A  small  fire  may  then  be  lit  and  checked  to 

ensure the smoke and fumes are taken from the 

stove  up  the  chimney  and  emitted  safely  to 

atmosphere.  

Do  not  run  the  stove  at  full  output  for  at  least 

24 hours. 

On  completion  of 

the  installation 

and 

commissioning,  ensure  that  the  operating 

instructions  and  operating  tools  for  the  stove 

are left with the customer.  

Advise  the  customer  on  the  correct  use  of  the 

appliance with the fuels likely to be used on the 

stove  and  warn  them  to  use  only  the 

recommended fuels for the stove. 

Advise the user on what to do should smoke or 

fumes be emitted from the stove.  

The user should be warned to use a fireguard to 

BS 8423 in the presence of children and/or 

infirm persons. 

Содержание eco 1

Страница 1: ...JINECO01 RevG 11 06 12 eco 1 1 1 1 CleanBurn Stove Installation and Operating Instructions...

Страница 2: ...g This stove has been designed and assembled so that it may be used to burn wood logs in a Smoke Control Area Find out if you are in a Smoke Control Area by contacting your Local Authority The Eco 1 h...

Страница 3: ...legal requirement to notify your local building control body in advance of any work starting HEALTH AND SAFETY PRECAUTIONS Special care must be taken when installing the stove such that the requiremen...

Страница 4: ...th the door open If fume emission does persist then the following action should be taken immediately Open doors and windows to ventilate room Let the fire out or eject and safely dispose of fuel from...

Страница 5: ...til Place a flue outlet gasket in position on the top plate of the stove and lower the flue collar or blanking plate as required on to the stove top taking care to line up the studs with the fixing Se...

Страница 6: ...lide to the left When the right side of the Baffle clears the Baffle Support lower the Baffle into the Fire Box and remove Slide the base of the Side Brick towards the move Pull the top edge of the Re...

Страница 7: ...allation If you have any doubts about the suitability of your chimney consult your local dealer stockist CONNECTION TO THE CHIMNEY The chimney must be swept before connection to the stove An existing...

Страница 8: ...nsure there is a free air gap of at least 150mm above and 50mm around the sides Where possible it is recommended that a free air gap of 150mm or more is left around the stove to obtain maximum heat ou...

Страница 9: ...output for at least 24 hours On completion of the installation and commissioning ensure that the operating instructions and operating tools for the stove are left with the customer Advise the customer...

Страница 10: ...an be unlocked from its position by twisting the control knob anti clockwise Once the slider is in the desired position it can be locked by turning the control knob clockwise This provides a conventio...

Страница 11: ...ive smoke LIGHTING THE STOVE We recommend that you have two or three small fires before you operate your stove to its maximum heat output This is to allow the paint to cure in steadily and to give a l...

Страница 12: ...ed administrations for those countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obtained for use in...

Страница 13: ...finish can be renovated with Hunter Stoves paint GLASS PANEL Clean the glass panel when cool with Hunter Stoves glass cleaner Highly abrasive substances should be avoided as these can scratch the glas...

Страница 14: ...ighting the stove GASKETS All gasket used on this appliance are produced from a heat resistant material called Manniglas The glass gasket will have to be replaced when a new piece of glass is fitted a...

Страница 15: ...Screw FSJM05008SS Door Slider CH05 009 Glass Gasket Eco02 015 Door Handle Assembly Eco02 ARRT 006 Glass Clip HHR08 046 Slider Knob HCE06 059 Door Cover HEC05 002 Door Glass Eco02 010 Rope Sealing Kit...

Страница 16: ...015 Ash Pan Eco01 003 Operating Tool HFR07 040 Riddling Bar lower CNS06 001 Riddling Bar upper CNS06 002 Riddling Support HH04 022 Tertiary Air Bar HH04 105 Baffle HHC05 007 Catch Bar Eco02 014 Side...

Отзывы: