Eco Air ECO1202S Скачать руководство пользователя страница 16

14

Test  running

Perform the electric safe check after completing installation:
1. Insulated resistance
    The insulated resistance must be more than 2M

.

2. Grounding work 
    After finishing grounding work, measure the grounding resistance by visual detection and 
    grounding resistance tester. Make sure the grounding resistance is less than 4

3. Electrical leakage check (performing during test running)
    During test operation after finishing installation, the serviceman can use the electroprobe 
    and multimeter to perform the electrical leakage check. Turn off the unit immediately if 
    leakage happens. Check and find out the solution ways till the unit operate properly.

A: Lo packed valve  B: Hi packed valve 
C and D are ends of indoor unit connection.

CAUTION

Indoor unit
check point

D

B

C

A

Outdoor unit
check point

Cover

Fig.25

    Electrical safety check

    Gas leak check

1. Soap water method:
    Apply a soap water or a liquid neutral detergent 
    on the indoor unit connection or outdoor unit 
    connections by a soft brush to check for leakage 
   of the connecting points of th piping. If bubbles
   come out, the pipes have leakage.
2. Leak detector

Use the leak detector to check for leakage.

ELECTRICAL SAFETY AND GAS LEAK CHECK

TEST RUNNING

Manual control 

Button

AUTO/COOL

Perform test running after completing gas leak and electrical safety check.
 The test running time should last more than 30 minutes.
1. Open the panel and lift the panel up to an angle which remains fixed. Do not lift the
    panel  any further when it stops with a  click sound.
2. Press the manual control button twice until the operating indicator lights up, the unit
    will operate on Forced Cool mode.
3. Check if all the functions works well during test running. Especially check whether
     the drainage of indoor unit is smooth or not.
4. Press the manual switch button again after  finishing the  test running . The operating
    indicator turns dark and the unit stops operating.

Содержание ECO1202S

Страница 1: ...eference Before using your air conditioner please read this manual carefully and keep it for future reference Before using your air conditioner please read this manual carefully and keep it for future...

Страница 2: ...ust be connected to the terminal which is marked with the letter N or coloured BLACK The BROWN wire is the LIVE and must be connected to the terminal which is marked with the letter L or coloured RED...

Страница 3: ...nit by yourself Improper installation will cause water leakage electrical shock or fire Please consult authorized dealer or specialist for the installation work Please note fault caused by improper in...

Страница 4: ...f the outdoor unit are not attached securely it could result in a fire or electrical shock due to dust water etc Perform electrical work according to the installation manual and be sure to use an excl...

Страница 5: ...Outdoor unit If an awning is built over the outdoor unit to prevent direct sunlight or rain exposure make sure that heat radiation from the condenser is not restricted Ensure that the clearance aroun...

Страница 6: ...minimise vibration excessive noise The indoor unit should be installed on the wall at a height of 2 3 metres or more from the floor Two of the A B and C directions should be free from obstructions CA...

Страница 7: ...allation plate Dimensions are in mm unless otherwise stated Wall Indoor Outdoor 5 7mm Fig 6 INSTALLATION INSTRUCTIONS A 40 B Right rear side refrigerant pipe hole 65 Installation plate Indoor unit out...

Страница 8: ...rom side to side to see that it is securely hooked 3 Piping can easily be made by lifting the indoor unit with a cushioning material between the indoor unit and the wall Get it out after finish piping...

Страница 9: ...hose sloped downward to drain out the con densed water smoothly CAUTION Install the outdoor unit on a rigid base to prevent increasing noise level and vibration Determine the air outlet direction wher...

Страница 10: ...o defect in the flaring work Carry out correct flaring work using the following procedure A Cut the pipes and the cable 1 Use the piping kit accessory or pipes purchased locally 2 Measure the distance...

Страница 11: ...RK Electric safety regulations for the initial Installation 1 If there is serious safety problem about the power supply the technicians should refuse to install the air conditioner and explain to the...

Страница 12: ...10 Electrical work Fig 20 Fig 21 Electrical control box cover Panel 10mm 10mm 40mm 40mm Cooling only type Cooling heating type Code wire Or 10mm 40mm Cooling heating type Terminal block of indoor uni...

Страница 13: ...cure the cable onto the control board with the cord clamp 1 Remove the electrical control board cover from the outdoor unit by loosening the screw 2 Connect the connective cables to the terminals as i...

Страница 14: ...hall be incorporated in the fixed wiring and have an air gap contact separation of at least 3mm in each active phase conductors CAUTION CAUTION CAUTION CAUTION AIR PURGING Air and moisture in the refr...

Страница 15: ...of the manifold valve 4 Operate the vacuum pump to evacuate After starting evacuation slightly loose the flare nut of the Lo valve on the gas pipe side and check that the air is entering Operation no...

Страница 16: ...ck 1 Soap water method Apply a soap water or a liquid neutral detergent on the indoor unit connection or outdoor unit connections by a soft brush to check for leakage of the connecting points of th pi...

Страница 17: ...MEMO Date of installation Purchased from Dealer Name Date of purchase Model number Serial number...

Страница 18: ...ing from a faulty installation is specifically excluded This unit must be operated under conditions as recommended at voltages indicated on the unit Any attempts made to service or modify the unit by...

Отзывы: