ENGLISH
Translation of the German original user manual
26
Caution!
Beware of hot water sprayings while cleaning the brew group.
7.3 Draining the boiler
1
Turn the machine off and let it cool down.
2
Close the shut-off valve or disconnect the machine from the water supply.
3
Remove the drip tray.
4
Open the hot water valve (caution: hot water may spray).
5
The water is released into the collection container through the drainage hose.
6
The boiler is empty, once no more water is shown in the water level indicator.
7
Close the hot water valve.
7.4 Small technical maintenance
(If you have any questions, please contact your specialised dealer.)
Replacing the group gasket and the shower screen
(Group gasket item no. P1021) and shower screen
(item no. C519900103) must be changed at the same time)
1
Switch the machine off and let it cool to room temperature.
Follow the steps as indicated below:
1
Brew group in the beginning.
2
Use a flat screwdriver to pry out
the shower screen and the group
gasket.
3
The shower screen and the gasket
are now nearly removed.