LiteWizard™ Installation Manual
Electronic Controls, Inc.
7073 North Atlantic Ave. Cape Canaveral, FL 32920
800-633-9788
P a g e
|
8
INPUT
TERMINAL PINS
OPTION SWITCH
1
1, 2
1
2
3,4
2
3
5,6
3
4
7,8
4
5
9,10
5
6
11,12
6
7.4.3
Timer Adjustments
There is one potentiometer (TIMER 1 and TIMER 2) associated with each relay (RELAY 1 and RELAY
2). Use these to adjust the time delay from the time all inputs are valid to power being turned off.
7.4.4
TEST button
Pressing the test button lights the TEST LED. This will shorten the delay times for the RELAYS to 10%
to allow for easy testing before closing up. Pressing the TEST button a second time will disable test
mode.
8
Installation
Be sure power is disconnected before starting installation
•
Configure all inputs for proper voltage
•
Set the OPTION switches to the ON position for each input used.
NOTE: switch 6 must always
be ON
•
Turn TIMER 1 and 2 potentiometers fully counter-clockwise.
•
Connect Cab lights and FAN power through desired relay output connections
•
Connect AC power to pin 34 and 35.
•
Apply power to unit
o
Some input LEDs may light.
9
Testing
NOTE: Before testing be sure that input combination for turning off lights and fan is
not valid; i.e. at least one of the inputs must be invalid or off and, if used, input 6
must be invalid or off.
•
Press the TEST button
o
The TEST LED should light
•
Put the inputs into the combination that should start the timer.