10
Before you start
2. Pull flexible drive shaft coupler 51 - 76 mm (2 -3 inches) out
of drive shaft assembly.
3. Align flexible drive shaft coupler with engine socket and slide
together.
4. Tighten clamping bolts.
Throttle linkage and ignition leads
1. Close choke and remove air filter cover.
2. Place inner throttle cable in large hole of carburettor swivel
(A).
3. Loosen nuts (B) and place threaded end of throttle linkage in
bracket slot. Finger tighten nuts (B).
4. Check throttle for freedom of movement and that wide open
throttle / low idle extremes are adjusted properly. If adjust-
ment cannot be achieved with adjusting nuts (B), consult
with your dealer for correct adjustment procedure. Tighten
nuts (B).
5. Connect two ignition stop leads (C,D) from throttle cable tub-
ing to two ignition leads (C,D) on engine.
6. Gather ignition wires and position in clip (E) behind air filter
case.
7. Install air filter and cover.
Cutting attachment to drive shaft installation
1. Loosen the two screws (C) and locator screw (D) on cutting
attachment.
Содержание PPT-236ES
Страница 2: ......
Страница 68: ...8 Beschreibung Beschreibung ...
Страница 91: ...31 1Notizen und hintere Umschlagseite NOTIZEN ...
Страница 120: ...X772 001474 X772227 8708 2015 1 7 2 Suehirocho Ohme Tokyo 198 8760 GIAPPONE TELEFONO 81 428 32 6118 FAX 81 428 32 6145 ...
Страница 146: ...26 Mantenimiento y cuidados 14 Guardar la unidad en un lugar seco libre de polvo y fuera del alcance de los niños ...
Страница 150: ...X772 001474 X772227 8708 2015 1 7 2 Suehirocho Ohme Tokio 198 8760 JAPÓN TELÉFONO 81 428 32 6118 FAX 81 428 32 6145 ...
Страница 151: ......
Страница 152: ...X772 001474 X772227 8708 2015 1 1 7 2 Suehirocho Ohme Tokyo 198 8760 JAPAN PHONE 81 428 32 6118 FAX 81 428 32 6145 ...