ECHO BARRIER H-SERIES Скачать руководство пользователя страница 23

ECHO BARRIER • USER MANUAL — REV. #0 (09/14/18) — PAGE 23

REPAIRS

PANEL REPAIR METHOD

Figure 17. Panel Repair

Heat Gun

Repair Patch

Hard Roller

A

B

C

D

Front of the Panel

1.  Identify the damaged area and cut a neat patch 

(Figure 17

A) to fit it. The patch should be slightly larger 

than the damaged area, and ideally rectangular.

2.  Gently heat the edges of the damaged area with a heat 

gun, taking care to not melt the surface of the panel. 

Place the patch over the damaged area (Figure 17

B), 

ensuring the edges are covered by the patch.

3.  Using the heat gun, heat the edges of both the patch 

and the damaged area (Figure 17

C). Without melting, 

they should become sufficiently soft to be pressed 

together.

4.  Use a hard roller to press together the patch and the 

edges of the damaged area (Figure 17

D), ensuring 

that they will not separate once they have cooled. If 

necessary, apply more heat whilst rolling.

  CAUTION

The roller can become hot, so take care to not touch 

the metal parts.

  NOTICE

If you are carrying out several repairs at one time, you 

will find that the hard roller will warm up, which will 

facilitate the process.

Back of the Panel

1.  Identify the damaged mesh area and cut a neat patch 

of mesh to fit it. The patch should be slightly larger than 

the damaged area, and ideally rectangular.

2.  Place the patch over the damaged area, ensuring the 

edges are covered by the patch.

3.  Using the heat gun, heat the edges of both the patch 

and the damaged area. When the mesh starts to shrink 

on the edges of the patch and the damaged area, it 

is time to press the patch and the main body of mesh 

together.

4.  Use a hard roller to press together the patch and the 

edges of the damaged area, ensuring that they will not 

separate once they have cooled.

  NOTICE

In all cases please refer to your company’s RAMS  

(Risk Assessment Method Statement).

  NOTICE

If the patch is quite large, start the repair process at 

one end and work in small stages until the process has 

been completed for the entire patch.

Содержание H-SERIES

Страница 1: ......

Страница 2: ...L REV 0 09 14 18 TABLE OF CONTENTS Echo Barrier Acoustic Panels Table of Contents 2 General Information 3 Safety Information 4 5 Installation Guide 6 14 Performance Guide 15 20 Storage and Transportat...

Страница 3: ...customers Our technical team is always available to advise on how best to deploy our acoustic panels in the context of a particular site project or eventuality Introduction Echo Barrier leads the wor...

Страница 4: ...sibility clothing for construction traffic sites Be aware that surfaces can become hot through exposure to sun radiation To prevent ignition damage DO NOT expose Echo Barrier panels to ammable substan...

Страница 5: ...NING NO CUTTING Sharp cutting tools may cause irreparable damage to Echo Barrier panels DO NOT use a blade or knife to cut fixings INSTRUCTION FIT THIS WAY The front of Echo Barrier panels must face t...

Страница 6: ...fixed on the structure using the existing eyelets in the panels NOTICE The Echo Barrier panels should NOT be pierced to create additional fixing points 4 Consider the environmental working conditions...

Страница 7: ...ion section Attaching the Echo Barrier Panels to the Supporting Structure There are two easy ways of attaching the acoustic panels to the supporting structure Echo Barrier s dedicated fitting kits Gen...

Страница 8: ...cables Figure 6 can be used to padlock the Echo Barrier panels to the supporting structure Figure 6 Security Cable Fixing Points The existing eyelets Figure 7 should serve as the sole fixing points fo...

Страница 9: ...e creation of a vertical acoustic curtain or for extra secure fixing This kit includes Buffalo Bolts INSTALLATION INSTRUCTIONS 1 Install a hook on the supporting structure e g fencing 2 Hold the Echo...

Страница 10: ...securing the panel to the fixing structure For cutting use scissors not a blade 3 Unhook the panels once all of the fastenings have been loosened or cut 4 Stack the panels safely NOTICE DO NOT use a b...

Страница 11: ...esult Please refer to specific product specification sheet UV resistant 3 years Safety features Night time reflective strips hazard icons Quick install 1 man assembly installation kits rollable Instal...

Страница 12: ...5 74 62 83 Elongation 73 23 20 200 Modulus of elasticity 73 23 lb in N mm 15 3 24 2 1 733 2 744 Hardness Rockwell 73 23 R112 R120 Hardness durometer 73 23 D80 D85 Flexural strength 73 23 lb in N mm 76...

Страница 13: ...Guide represents the general guidelines for effective installation and optimum use of Echo Barrier panels Echo Barrier Limited reserves the right to alter these suggestions It is the responsibility o...

Страница 14: ...ved on condition that full details are supplied to Multiquip or Echo Barrier the components have not been modified or tampered with and Multiquip or Echo Barrier is informed of any damage shortages pr...

Страница 15: ...e Human Ear Noise levels are measured in decibels dB Since the decibel is a logarithmic non linear unit of measurement noise mitigation of just 3 dB is equivalent to a substantial 50 reductioninnoisee...

Страница 16: ...ISEMITIGATION There are 4 key factors that determine the noise mitigation achieved by a barrier of any kind 1 Geometry The position of the barrier in relation to the noise source 2 Noise absorption Th...

Страница 17: ...over the barrier High frequency sound is more directional than lower frequency sound This means that higher frequency sounds encountering a barrier are easier to mitigate than low frequency sound whi...

Страница 18: ...rtable noise barrier to be both effective at noise mitigation and physically manageable it needs to strike the optimum balance between mass weight and dimensions Echo Barrier s modular system of compa...

Страница 19: ...els which can be jet washed maintain their appearance throughout their usable life remaining a visual as well as a practical asset Ease of Use Safety and Environmental Responsibility Echo Barrier s in...

Страница 20: ...caffold curtain fit kit Quicker installation with fewer personnel Minimum 5 year life durable and well made Value for money Site total marks from possible 8 8 Site safety and security No fiberglass Ro...

Страница 21: ...um 14 barriers folded 1 2 m 3 ft 11 inches 1 2 m 1 m A B C D 1 Ensure the pallet Figure 15A is in good condition Broken slats or protruding nails could damage the Echo Barrier panels 2 Fold each panel...

Страница 22: ...ront of the panel with warm soapy water and a stiff brush Figure 16C 8 Pressure wash the front of the panel to remove soap and residue 9 Using the wet vac remove surface water from the front of the pa...

Страница 23: ...AUTION The roller can become hot so take care to not touch the metal parts NOTICE If you are carrying out several repairs at one time you will find that the hard roller will warm up which will facilit...

Страница 24: ...contained in this manual are for guidance only and may not be considered as binding Multiquip Inc reserves the right to discontinue or change specifications design or the information published in this...

Отзывы: