PRODUCT WATER TUBING
Run the blue product water tubing or for longer distances than 15ft / 5m a 1/2" PVC hose or pipe from
the marked (Tank) outlet of the flow control panel to your fresh water storage tank. Run blue product
water tubing from the marked (Test) outlet of the flow control panel to a taste/test station of your choice.
Do not allow the product line to become blocked while the system is running. It must be avoided that
chlorinated water from your storage tanks sucks back into the RO membranes. Therefore, lead the
product water into the tanks above water level.
The Product water can be led to the storage tanks up to a height of 20m/65ft. In this case a non return
valve must be installed in the product line to protect the membrane from back-pressure.
REJECT WATER TUBING/HOSE
Connect the outlet of the pressure control valve on the back of the flow control panel of the desalination
system with a 1/2” reinforced PVC hose to a reject (brine) 1/2” PVC pipe. The brine should be disposed
of as far as possible (30ft / 10m) and down current from the seawater intake.