Page 2 of 5
Un-packing and Pre-installation:
Carefully examine the unit for damage before installation. If damage
is found, contact the transit company or ECCO. Do not use broken or
damaged parts.
Prior to mounting, consideration should be given to cable location.
The mounting location should be chosen such that there is maximum
visibility to the oncoming traffic.
Installation:
Each kit includes 1 indicator light per flood light which can be installed
on top or either side.
To assemble the indicator on the flood light, start by removing the M3
screws and indicator port cover. Connect the indicator wires to the flood
light and cover the connection in dielectric grease to reduce exposure to
the elements.
Install the indicator as shown in Figure 1 and secure in place with
the two M4 screws included using a 3mm hex key.
Note: The amber
indicator functions only as a turn signal.
Installation and Mounting
Figure 1
Figure 2
Содержание EW4011
Страница 4: ...Page 4 of 5 Notes...