+OK
Indicates that the setting was successful.
4. Restart (after all AT commands modify parameters, the device will take effect after restarting)
Execution command AT+REBT returns OK and the device restarts immediately. Here IP only shows the
demonstration. The actual connection is based on the IP of the server to be connected.
5. After the base station is connected, the NET light is always on to indicate that the server is connected, and transparent
transmission is possible at this time.
2.2 Data transmission test