Operating instructions

S4E450-AU03-01

Translation of the original operating instructions

4.4 Connection diagram

L

= U1 = blue

Z

brown

N

= U2 = black

PE

green/yellow

Item no. 11099-5-9970 · ENU · Change 226133 · Approved 2021-01-14 · Page 9 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4E450-AU03-01

Страница 1: ...cal staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The...

Страница 2: ...opriate shielding measures have to be taken by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant...

Страница 3: ...unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operati...

Страница 4: ...s in mm 1 Direction of air flow V 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 11099 5 9970 ENU Change 226133 Approved 2021 01 14 Page 4 12 ebm...

Страница 5: ...rP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 7 3 kg Size 450 mm Motor size 94 Rotor surface Painted black Terminal box...

Страница 6: ...ke sure the impeller moves easily and that the blades of the impeller are not deformed or bent and do not catch at any point NOTE Damage to the device from vibration Bearing damage shorter service lif...

Страница 7: ...ent devices cannot provide personal safety while operating the device 4 2 3 Voltage control NOTE Current overshoots may occur if speed control is implemented by transformers or electronic voltage regu...

Страница 8: ...s not possible a drip edge can be produced by fitting a cable tie directly in front of the cable gland for example Fans installed lying flat Make sure the cable is routed in a U shaped loop Fig 2 Fan...

Страница 9: ...ions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 11099 5 9970 ENU Change 226133 Approved 2021 01 14 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfing...

Страница 10: ...instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonan...

Страница 11: ...d replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vi...

Страница 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Отзывы: